flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Experts pessimistic on Chicago’s $650 million McCormick Place expansion

Events Facilities

Experts pessimistic on Chicago’s $650 million McCormick Place expansion

Developers and city officials envision $250 million of annual growth, but the figure assumes that a new arena will lure conventions and draw full houses for basketball games.


By Mike Chamernik, Associate Editor | March 7, 2016
Experts pessimistic on Chicago’s $650 million McCormick Place expansion

The new DePaul Arena at McCormick Place Event Center. Courtesy Pelli Clarke Pelli Architects

After a decade and a half of downturn, Chicago envisions a new boom period for its South Loop convention center district. The Metropolitan Pier and Exposition Authority, known as McPier, is revamping McCormick Place, adding a hotel and arena through a $650 million McCormick Place Event Center expansion project.

Gensler designed the hotel, the 1,200-room, $450 million Marriott Marquis. The arena, designed by Pelli Clarke Pelli, is a basketball venue for DePaul, the city’s Division-I college hoops team. McPier funded a study that says the new buildings could generate $250 million in spending per year.

That figure, though, is fairly optimistic. The Chicago Tribune reports that experts are doubting the project, saying that the investments will ultimately cost taxpayers.

The McPier study has a few faulty assumptions. One, it is based on DePaul averaging nearly 10,000 fans a game, almost triple its current attendance. Two, McPier plans on using the arena for conventions, but studies have said that arenas are poor hosts for conventions due to their fixed seating. If the arena struggles to make money either in terms of basketball or conventions, then the hotel will have to make up that difference. 

Stadiums have been found to be unsuccessful drivers of economic growth, which is an issue because McPier has already borrowed hundreds of millions of dollars and maxed out its debt limit. 

"It was a dumb idea when it was proposed, it was a dumb idea when they approved it, and it will be a dumb idea in the future," Marc Ganis, a Chicago consultant who specializes in sports, said in the Tribune piece.

The Tribune has much more detail on the project, which is set to open in 2017.

Several issues have arisen with concerning the development over the last few years, including eminent domain battles, rising construction costs, and disagreements over $55 million in tax increment financing (TIF) funds.

Related Stories

Events Facilities | Oct 23, 2017

The Indianapolis Zoo’s Bicentennial Pavilion and Promenade is modeled after a lush rainforest

The 40,000-sf space can support a wide variety of group activities.

Mixed-Use | Sep 18, 2017

Urban heartbeat: Entertainment districts are rejuvenating cities and spurring economic growth

Entertainment districts are being planned or are popping up all over the country.

AEC Tech | Aug 25, 2017

Software cornucopia: Jacksonville Jaguars’ new practice facility showcases the power of computational design

The project team employed Revit, Rhino, Grasshopper, Kangaroo, and a host of other software applications to design and build this uber-complex sports and entertainment facility. 

Wood | Jul 10, 2017

University of Idaho Arena plans to make timber a focal point

The project received a Wood Innovation Grant that will help spur construction of the Hastings + Chivetta-designed project.

Events Facilities | Apr 27, 2017

20-acre lagoon highlights $1.5 billion Paradise Park planned for Las Vegas

The Wynn Resorts board recently gave the go-ahead for the project, which may begin construction on its first phase as early as December.

Sports and Recreational Facilities | Apr 5, 2017

Informed design: A dynamic approach to athletic facilities design

With the completion of the athletic facility upgrade—dubbed the Arden Project—students will have access to state-of-the-art facilities.

Reconstruction & Renovation | Mar 16, 2017

Brooklyn’s ‘Batcave’ will become a series of fabrication shops

The century-old building will be turned into fabrication shops in wood, metal, ceramics, textiles, and printmaking.

Cultural Facilities | Mar 2, 2017

The Hanoi Lotus Centre will bloom from the middle of a lake

The building will act as a symbol of growth and prosperity for the city of Hanoi.

Events Facilities | Feb 3, 2017

Design team for Javits Center’s $1.5 billion expansion announced

The center’s expansion will cover 1.2 million-sf.

Events Facilities | Feb 2, 2017

Abstract meets geometrical in new Rome-Eur Convention Center

Three elements make up the building’s design: the Theca, the Cloud, and the Blade.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021