flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fake architect caught in ‘Operation Vandelay Industries’ sentenced to 2 1/3 to 7 years in prison

Architects

Fake architect caught in ‘Operation Vandelay Industries’ sentenced to 2 1/3 to 7 years in prison

The fake architect must also pay a $115,000 restitution.


By David Malone, Associate Editor | September 6, 2017
A man's hands handcuffed behind his back

Pixabay Public Domain

Goodbye, Newman.

In a case saturated in pop culture references, a fake architect named Paul J. Newman has been sentenced to 2 1/3 to 7 years in prison after he was caught in a New York state fraud investigation dubbed “Operation Vandelay Industries,” a reference to the 90’s sitcom Seinfeld.

Newman was sentenced on Sept. 5 after pleading guilty to six felonies that included grand larceny and fraud, the Associated Press reports. As part of his sentence, Newman must pay a $115,000 restitution.

According to Attorney General Eric Schneiderman’s office, Newman rendered fraudulent architectural services in Albany, Rensselaer, and Saratoga counties dating back to 2010. His victims include municipalities and businesses.

For those not well versed in the show about nothing’s running gags, Art Vandelay, a phony architect, was the alias of George Costanza. Vandelay Industries later became a fictional company on the show. Seinfeld’s Newman, meanwhile, was Jerry Seinfeld’s arch nemesis.

Tags

Related Stories

Architects | Jul 22, 2016

5 creative approaches to finish standards

With the right mindset, standards can produce great design for healthcare facilities, as VOA's Candace Small explores.

Retail Centers | Jul 21, 2016

MVRDV designs Seoul entertainment district with gold entrance and curtain façade

The 9,800-sm complex will have retail and nightclub space. A plaza separates the two concrete buildings.

Healthcare Facilities | Jul 20, 2016

Process mapping simplifies healthcare design

Charting procedures and highlighting improvement opportunities can lead to developing effective design strategy simulations. GS&P’s Ray Wong writes that process mapping adds value to a project and bolsters team and stakeholder collaboration.

Architects | Jul 20, 2016

AIA: Architecture Billings Index remains on solid footing

The June ABI score was down from May, but the figure was positive for the fifth consecutive month.   

| Jul 19, 2016

2016 GIANTS 300 REPORT: Ranking the nation's largest architecture, engineering, and construction firms

Now in its 40th year, BD+C’s annual Giants 300 report ranks AEC firms by discipline and across more than 20 building sectors and specialty services.

Architects | Jul 18, 2016

17 buildings designed by Le Corbusier added to UNESCO World Heritage List

The sites are spread across seven counties and were built over the course of 50 years. Le Corbusier, an architect, designer, and urban planner, was a founder of modern architecture.

Multifamily Housing | Jul 18, 2016

Four residential projects named winners of the 2016 AIA/HUD Secretary Awards

Affordable housing, specialized housing, and accessible housing projects were honored.  

Sports and Recreational Facilities | Jul 18, 2016

Turner and AECOM will build the Los Angeles Rams’ new multi-billion dollar stadium project

The 70,000-seat stadium will be ready by the 2019 NFL season. The surrounding mixed-use development includes space for retail, hotels, and public parks.

High-rise Construction | Jul 15, 2016

Zaha Hadid designs geometric flower-shaped tower for sustainable Qatar city

The 38-story building will have a mashrabiya latticed facade with hotel and residential space inside.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021