flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Firestone Building Products launches new website

Firestone Building Products launches new website

Deep product information and innovative customer support tools are highlights.


By Posted by Tim Gregorski, Senior Editor | September 18, 2012

Firestone Building Products Company, LLC, a manufacturer and supplier of a comprehensive "Roots to Rooftops" system of building envelope solutions, announced the launch of a new website as a deep informational resource for its customers. Firestone Building Products works with many of the nation's preeminent architects and contractors, building owners, building maintenance companies and industry consultants.

The site (http://www.firestonebpco.com) is a "one-stop-shop" for professionals looking for robust product knowledge, specifications and case studies. In fact, the new site combines content from four separate websites devoted to the company's vast portfolio of roofing, metal, green and specialty products. The integrated site highlights the overarching theme of Firestone Building Products' commitment to performance—building, product and team—in service to customers' needs.

Visitors to firestonebpco.com can navigate through content on Education and Training, Project Profiles and Building Envelope solutions. The site has close to 100 case studies and over 1,000 pages of detailed content on Firestone Building Products:

  • Roofing systems, insulation, energy solutions and accessories
  • Metal wall panel systems, column covers, light shelves and sun screens
  • Water management solutions systems, such as pond liners and membranes for containment and passive water management
  • Education and training resources
  • Warranty, installation and customer support services

The site is also the gateway to Firestone Building Products' proprietary, innovative tools such as their new iPad app, mobile app and a RoofGenuity interactive modeling program. The iPad app provides multiple views that allow customers to explore Firestone Building Products' solutions from different angles and in a variety of real-world settings. It also includes product specifics to show how the company's solutions work and apply to a wide range of projects. The mobile app is a convenient way for individuals charged with maintaining commercial roofing systems to connect with Firestone Building Products' Quality Building Services Team to ask questions, report a leaky roof, request an in-depth analysis, or use the GPS locator and image upload feature to share detailed information about an issue in the field. The RoofGenuity program is a web-based roof modeling/building information modeling (BIM) tool. It provides 3D visualization capabilities that allow architects, consultants, roofing contractors and building owners to assemble usable, warrantable solutions for all their roofing needs. +

Related Stories

Multifamily Housing | Apr 26, 2017

Multifamily amenity trends: The latest in package delivery centers

Package delivery centers provide order and security for the mountains of parcels piling up at apartment and condominium communities.

Multifamily Housing | Apr 26, 2017

Huh? A subway car on the roof?

Chicago’s newest multifamily development features an iconic CTA car on its amenity deck. 

High-rise Construction | Apr 26, 2017

Dubai’s newest building is a giant gilded picture frame

Despite currently being under construction, the building is the center of an ongoing lawsuit filed by the architect.

Architects | Apr 25, 2017

Two Mid-Atlantic design firms join forces

Quinn Evans Architects and Cho Benn Holback + Associates have similar portfolios with an emphasis on civic work. 

BIM and Information Technology | Apr 24, 2017

Reconciling design energy models with real world results

Clark Nexsen’s Brian Turner explores the benefits and challenges of energy modeling and discusses how design firms can implement standards for the highest possible accuracy.

Higher Education | Apr 24, 2017

Small colleges face challenges — and opportunities

Moody’s Investor Service forecasts that closure rates for small institutions will triple in the coming years, and mergers will double.

Healthcare Facilities | Apr 24, 2017

Treating the whole person: Designing modern mental health facilities

Mental health issues no longer carry the stigma that they once did. Awareness campaigns and new research have helped bring our understanding of the brain—and how to design for its heath—into the 21st century.

Architects | Apr 20, 2017

Design as a business strategy: Tapping data is easier than you think

We have been preaching “good design matters” for a long time, demonstrating the connection between the physical environment and employee satisfaction, individual and team performance, and an evolving organizational culture.

Architects | Apr 20, 2017

‘Gateways to Chinatown’ project seeks the creation of a new neighborhood landmark for NYC’s Chinatown

The winning team will have $900,000 to design and implement their proposal.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021