flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Firestone Building Products launches new website

Firestone Building Products launches new website

Deep product information and innovative customer support tools are highlights.


By Posted by Tim Gregorski, Senior Editor | September 18, 2012

Firestone Building Products Company, LLC, a manufacturer and supplier of a comprehensive "Roots to Rooftops" system of building envelope solutions, announced the launch of a new website as a deep informational resource for its customers. Firestone Building Products works with many of the nation's preeminent architects and contractors, building owners, building maintenance companies and industry consultants.

The site (http://www.firestonebpco.com) is a "one-stop-shop" for professionals looking for robust product knowledge, specifications and case studies. In fact, the new site combines content from four separate websites devoted to the company's vast portfolio of roofing, metal, green and specialty products. The integrated site highlights the overarching theme of Firestone Building Products' commitment to performance—building, product and team—in service to customers' needs.

Visitors to firestonebpco.com can navigate through content on Education and Training, Project Profiles and Building Envelope solutions. The site has close to 100 case studies and over 1,000 pages of detailed content on Firestone Building Products:

  • Roofing systems, insulation, energy solutions and accessories
  • Metal wall panel systems, column covers, light shelves and sun screens
  • Water management solutions systems, such as pond liners and membranes for containment and passive water management
  • Education and training resources
  • Warranty, installation and customer support services

The site is also the gateway to Firestone Building Products' proprietary, innovative tools such as their new iPad app, mobile app and a RoofGenuity interactive modeling program. The iPad app provides multiple views that allow customers to explore Firestone Building Products' solutions from different angles and in a variety of real-world settings. It also includes product specifics to show how the company's solutions work and apply to a wide range of projects. The mobile app is a convenient way for individuals charged with maintaining commercial roofing systems to connect with Firestone Building Products' Quality Building Services Team to ask questions, report a leaky roof, request an in-depth analysis, or use the GPS locator and image upload feature to share detailed information about an issue in the field. The RoofGenuity program is a web-based roof modeling/building information modeling (BIM) tool. It provides 3D visualization capabilities that allow architects, consultants, roofing contractors and building owners to assemble usable, warrantable solutions for all their roofing needs. +

Related Stories

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

| Nov 10, 2011

Grousbeck Center for Students & Technology opens doors

New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021