flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Firestone Building Products launches new website

Firestone Building Products launches new website

Deep product information and innovative customer support tools are highlights.


By Posted by Tim Gregorski, Senior Editor | September 18, 2012

Firestone Building Products Company, LLC, a manufacturer and supplier of a comprehensive "Roots to Rooftops" system of building envelope solutions, announced the launch of a new website as a deep informational resource for its customers. Firestone Building Products works with many of the nation's preeminent architects and contractors, building owners, building maintenance companies and industry consultants.

The site (http://www.firestonebpco.com) is a "one-stop-shop" for professionals looking for robust product knowledge, specifications and case studies. In fact, the new site combines content from four separate websites devoted to the company's vast portfolio of roofing, metal, green and specialty products. The integrated site highlights the overarching theme of Firestone Building Products' commitment to performance—building, product and team—in service to customers' needs.

Visitors to firestonebpco.com can navigate through content on Education and Training, Project Profiles and Building Envelope solutions. The site has close to 100 case studies and over 1,000 pages of detailed content on Firestone Building Products:

  • Roofing systems, insulation, energy solutions and accessories
  • Metal wall panel systems, column covers, light shelves and sun screens
  • Water management solutions systems, such as pond liners and membranes for containment and passive water management
  • Education and training resources
  • Warranty, installation and customer support services

The site is also the gateway to Firestone Building Products' proprietary, innovative tools such as their new iPad app, mobile app and a RoofGenuity interactive modeling program. The iPad app provides multiple views that allow customers to explore Firestone Building Products' solutions from different angles and in a variety of real-world settings. It also includes product specifics to show how the company's solutions work and apply to a wide range of projects. The mobile app is a convenient way for individuals charged with maintaining commercial roofing systems to connect with Firestone Building Products' Quality Building Services Team to ask questions, report a leaky roof, request an in-depth analysis, or use the GPS locator and image upload feature to share detailed information about an issue in the field. The RoofGenuity program is a web-based roof modeling/building information modeling (BIM) tool. It provides 3D visualization capabilities that allow architects, consultants, roofing contractors and building owners to assemble usable, warrantable solutions for all their roofing needs. +

Related Stories

| Oct 27, 2011

ASSA Abloy, MAXXESS Systems announce U.S. Aperio integration

Aperio will integrate with MAXXESS's eAXxess  and Efusion Event Management Software packages.

| Oct 26, 2011

Metl-Span selected for re-roof project

School remained in session during the renovation and it was important to minimize the disruption as much as possible.

| Oct 26, 2011

Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.

New store features 1,200 sf fit out at Aventura Mall.

| Oct 25, 2011

HKS Science & Technology practice formed

Specializing in the planning and design of highly technical building types, HKS’s Science & Technology practice offers the broadest range of services available to the academic and biomedical research, biotechnology, pharmaceutical and medical device community, including laboratory programming, planning and design, strategic science planning and laboratory equipment planning.

| Oct 25, 2011

Universal teams up with Earthbound Corp. to provide streamlined commercial framing solutions

The primary market for the Intact Structural Frame is light commercial buildings that are typically designed with concrete masonry walls, steel joists and steel decks.

| Oct 25, 2011

Ritner Steel CEO elected to AISC Board

Freund will begin serving on the AISC board of directors, assisting with the organization's planning and leadership in the steel construction industry.

| Oct 25, 2011

Commitment to green building practices pays off

The study, conducted by the Pacific Northwest National Laboratory, built on a good indication of the potential for increased productivity and performance pilot research completed two years ago, with similarly impressive results.

| Oct 25, 2011

DOE issues report on financing solar photovoltaic systems for K-12 schools

The report examines the two primary types of ownership models used to obtain solar installations. This analysis can help school administrators across the country select the best option for deploying solar technologies in their school districts.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021