flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Firestone Building Products launches new website

Firestone Building Products launches new website

Deep product information and innovative customer support tools are highlights.


By Posted by Tim Gregorski, Senior Editor | September 18, 2012

Firestone Building Products Company, LLC, a manufacturer and supplier of a comprehensive "Roots to Rooftops" system of building envelope solutions, announced the launch of a new website as a deep informational resource for its customers. Firestone Building Products works with many of the nation's preeminent architects and contractors, building owners, building maintenance companies and industry consultants.

The site (http://www.firestonebpco.com) is a "one-stop-shop" for professionals looking for robust product knowledge, specifications and case studies. In fact, the new site combines content from four separate websites devoted to the company's vast portfolio of roofing, metal, green and specialty products. The integrated site highlights the overarching theme of Firestone Building Products' commitment to performance—building, product and team—in service to customers' needs.

Visitors to firestonebpco.com can navigate through content on Education and Training, Project Profiles and Building Envelope solutions. The site has close to 100 case studies and over 1,000 pages of detailed content on Firestone Building Products:

  • Roofing systems, insulation, energy solutions and accessories
  • Metal wall panel systems, column covers, light shelves and sun screens
  • Water management solutions systems, such as pond liners and membranes for containment and passive water management
  • Education and training resources
  • Warranty, installation and customer support services

The site is also the gateway to Firestone Building Products' proprietary, innovative tools such as their new iPad app, mobile app and a RoofGenuity interactive modeling program. The iPad app provides multiple views that allow customers to explore Firestone Building Products' solutions from different angles and in a variety of real-world settings. It also includes product specifics to show how the company's solutions work and apply to a wide range of projects. The mobile app is a convenient way for individuals charged with maintaining commercial roofing systems to connect with Firestone Building Products' Quality Building Services Team to ask questions, report a leaky roof, request an in-depth analysis, or use the GPS locator and image upload feature to share detailed information about an issue in the field. The RoofGenuity program is a web-based roof modeling/building information modeling (BIM) tool. It provides 3D visualization capabilities that allow architects, consultants, roofing contractors and building owners to assemble usable, warrantable solutions for all their roofing needs. +

Related Stories

| Oct 25, 2011

MKK participates in BSA Engineering Merit Badge day

MKK principal Craig Watts attended the event as a representative of the MEP (mechanical/electrical/plumbing) engineering industry to give scouts an idea of what’s involved in becoming a mechanical engineer, and an overview of a typical day in the life of an engineer.

| Oct 24, 2011

FMI releases Adjust, Adapt, Act Study

 The paper explores several case studies, including Sun Country Builders, Huen, BakerTriangle, Consigli, Skender Construction and Flatiron, and distills the key factors that make these companies unique and successful.

| Oct 24, 2011

BBS Architects & Engineers receives 2011 Sustainable Design Award from AIA Long Island Chapter

AIA LI also recognized BBS with the 2011 ARCHI Award Commendation for the St. Charles Resurrection Cemetery St. Charles Resurrection Cemetery Welcoming and Information Center in Farmingdale, NY.

| Oct 24, 2011

Kolbe adds 3-D models of direct set windows to BIM library?

Beveled Direct Set SketchUp and Revit Models available.

| Oct 20, 2011

UNT receives nation’s first LEED Platinum designation for collegiate stadium

Apogee Stadium will achieve another first in December with the completion of three wind turbines that will feed the electrical grid that powers the stadium.

| Oct 20, 2011

Process leads to new design values for southern pine and other visually graded dimension lumber

A summary of the process used to develop new design values will clarify many of the questions received by the SFPA.

| Oct 20, 2011

Johnson Controls appoints Wojciechowski to lead real estate and facilities management business for Global Technology sector

Wojciechowski will be responsible for leading the continued growth of the technology vertical market, while building on the expertise the company has developed serving multinational technology companies. 

| Oct 20, 2011

Stellar hires Navy veteran Taylor as vice president

Stellar’s federal experience includes military exchanges (large retail stores on military bases), lodging facilities for military personnel, fuel stations, youth activities centers and recreational centers. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021