flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First look: Austin breaks ground on 'light-filled' Central Library

First look: Austin breaks ground on 'light-filled' Central Library

Design scheme by Lake|Flato and Shepley Bulfinch incorporates reading "porches" and a light-filled, six-story atrium.


By BD+C Editors | June 7, 2013
The city of Austin, Texas, last week broke ground on its new Central Library, establishing a major civic presence and community gathering space in the heart of the city’s redeveloped Seaholm district. The library, which is scheduled for completion in 2016, is designed by the architectural joint venture of Lake|Flato and Shepley Bulfinch.
 
The building is defined by a light-filled, six-story atrium space wrapped by collections and event space. Distinctive elements include a series of reading porches that overlook Shoal Creek and Lady Bird Lake, a quiet reading room, café, and Recycled Reads bookstore. Special areas that support the city’s emerging culture and arts scene include a 350-seat special events center.
 
The library is targeting a minimum of LEED (Leadership in Energy and Environmental Design) Silver certification. Its sustainable strategies include a major photovoltaic panel array, which will generate electrical power for the building; a rainwater harvesting system that will provide water for landscape irrigation and restroom plumbing fixtures; and a landscaped roof.
 
The facility supports alternative transportation, with charging stations for electric cars; a 150-bike corral, and direct links to the multi-use paths that run along the water.
 
The 198,000 square foot facility will replace the city’s 1979 Faulk Central Library.
 
 
 
 
 
 

Related Stories

| Aug 3, 2012

Nonres construction spending to increase through 2012, growth projected for 2013

Commercial and industrial projects poised to lead building sectors.

| Jul 31, 2012

Thornton Tomasetti announces four promotions in Chicago office

Promotions in Thornton Tomasetti office key on industy veterans.

| Jul 25, 2012

EwingCole adds healthcare director to D.C. office

Schultz brings over 25 years of proven experience in planning and designing healthcare, medical research, and government medical facilities.

| Jul 25, 2012

Contract awarded for Gaillard Municipal Auditorium renovations in Charleston, S.C.

Seeking LEED Silver certification, the project will begin in August and is slated for completion in December 2014.

| Jul 24, 2012

Boyer joins Thornton Tomasetti as vice president in New York office

Boyer will support Thornton Tomasetti’s Building Performance and Property Loss Consulting practices in the East U.S. region as well as nationally.

| Jul 24, 2012

Dragon Valley Retail at epicenter of Yongsan International Business District

Masterplanned by architect Daniel Libeskind, the Yongsan IBD encompasses ten city blocks and includes a collection of high-rise residences and commercial buildings.

| Jul 23, 2012

Venturi Scott Brown and Associates Becomes VSBA, LLC

After over fifty years as one of the world’s most renowned architects, Bob Venturi has retired from practice, while Denise Scott Brown continues to publish and present her work.

| Jul 23, 2012

Giants 300 Firm Index 2012

An alphabetical index of the Giants 300 AEC firms and their ranking in specific categories.

| Jul 23, 2012

Haynes Whaley announces leadership transition

Pronier has worked in the construction industry for the past 30 years.

| Jul 23, 2012

Missner Group completes construction of Chicago auto dealership

The Missner Group also incorporated numerous sustainable improvements to the property including the implementation of a vegetative roof, and the utilization of permeable pavers for the parking lot.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021