flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First look: Austin breaks ground on 'light-filled' Central Library

First look: Austin breaks ground on 'light-filled' Central Library

Design scheme by Lake|Flato and Shepley Bulfinch incorporates reading "porches" and a light-filled, six-story atrium.


By BD+C Editors | June 7, 2013
The city of Austin, Texas, last week broke ground on its new Central Library, establishing a major civic presence and community gathering space in the heart of the city’s redeveloped Seaholm district. The library, which is scheduled for completion in 2016, is designed by the architectural joint venture of Lake|Flato and Shepley Bulfinch.
 
The building is defined by a light-filled, six-story atrium space wrapped by collections and event space. Distinctive elements include a series of reading porches that overlook Shoal Creek and Lady Bird Lake, a quiet reading room, café, and Recycled Reads bookstore. Special areas that support the city’s emerging culture and arts scene include a 350-seat special events center.
 
The library is targeting a minimum of LEED (Leadership in Energy and Environmental Design) Silver certification. Its sustainable strategies include a major photovoltaic panel array, which will generate electrical power for the building; a rainwater harvesting system that will provide water for landscape irrigation and restroom plumbing fixtures; and a landscaped roof.
 
The facility supports alternative transportation, with charging stations for electric cars; a 150-bike corral, and direct links to the multi-use paths that run along the water.
 
The 198,000 square foot facility will replace the city’s 1979 Faulk Central Library.
 
 
 
 
 
 

Related Stories

| Jul 16, 2012

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.

| Jul 12, 2012

New firm RSK Avanti Partners offers market development services

Full-service consulting firm is focused on working with product manufacturers, designers, specifies and contractors in the building construction market.

| Jul 12, 2012

Chicago Public Schools names Lend Lease team as construction manager

Under this Capital Improvement Program, the Lend Lease team will be responsible for renovation and life safety work at over 100 Chicago Public Schools across the City.

| Jul 12, 2012

Cramer joins Gilbane’s NYC Business Development Team

New Business Development Manager brings over 30 years of experience to Gilbane.

| Jul 12, 2012

Cardoso joins Margulies Perruzzi Architects

Senior architect brings experience, leadership to firm’s healthcare practice.

| Jul 12, 2012

EE&K and Knutson Construction selected for the Interchange in Minneapolis

Design-build contract for $79.3 million transportation hub will connect transit with culture.

| Jul 11, 2012

New BDC University course: Design Criteria for Ceramic Tile/Stone Installations

Everyone that successfully completed to course will receive 1.0 HSW/LU AIA LU.

| Jul 11, 2012

Perkins+Will designs new home for Gateway Community College

Largest one-time funded Connecticut state project and first designed to be LEED Gold.

| Jul 11, 2012

HOK honored with Los Angeles architectural award

42nd annual awards from the Los Angeles Business Council honor design excellence.

| Jul 11, 2012

Skanska relocates its Philadelphia metro office

Construction firm’s new 19,100-sf office targets LEED Gold certification.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021