FirstEnergy Stadium, where the Cleveland Browns play their home games, may be covered in the same cladding used on Grenfell Tower, according to the Associated Press. The cladding is being investigated as a possible accelerate in the tragic London fire that killed at least 80 people last month.
In promotional brochures on Arconic’s (the company that sells the panels) website, FirstEnergy Stadium is listed as using 100,000 sf of the cladding in question on its exterior. Additionally, the Baltimore Marriott Waterfront hotel, an Alaskan high school, Dallas-Fort Worth International Airport’s Terminal D, a nine-story mixed-use building in Denver, and six Early Development Education Centers for the Detroit Public School System are also listed as having used the cladding.
However, because in many cases the building records have been discarded, the owners, operators, contractors, and architects are unable to confirm if Arconic’s Reynobond panels were used on any of the structures in question.
A spokesman for Cleveland’s mayor would not confirm or deny if the city-owned stadium was built with the cladding in question, saying any questions would need to wait until the investigation into the Grenfell Tower fire finishes.
In the case of the Baltimore Marriott, which was constructed in 2001, an architect who worked on the project said he destroyed his building records pertaining to the property in 2011 because his contract only requires him to keep files for 10 years.
According to the AP story, the U.S buildings have not been declared unsafe and no widespread testing of aluminum paneling has been initiated by the U.S. government as of yet.
To read the entire AP story, click here.
Related Stories
Brick and Masonry | Feb 5, 2015
3D-printed 'cool brick' may provide cooling solution for arid locations
Cool Brick is made of porous ceramic bricks set in mortar. The bricks absorb water, which cools the air as it passes through the unit.
| Dec 28, 2014
Robots, drones, and printed buildings: The promise of automated construction
Building Teams across the globe are employing advanced robotics to simplify what is inherently a complex, messy process—construction.
Sponsored | | Sep 25, 2014
Architects transform warehouse into office space while preserving its historic nature
When it came time for CSHQA, an award-winning, full-service architecture and engineering firm, to move office locations, they didn’t need to look far. The 20,000-square-foot warehouse was not only a mere three blocks away, its renovation would be an ideal demonstration piece to show existing and potential clients.
| Sep 7, 2014
Building the cladding palette: panels, rainscreens, and veneers [AIA course]
When it comes to cost, performance, and aesthetics—not to mention maintenance and long-term resilience—the evaluation of cladding materials and façade systems is more complex than ever. This course is worth 1.0 AIA CES HSW learning units.
| Jul 1, 2014
Sochi's 'kinetic façade' may steal the show at the Winter Olympics
The temporary pavilion for Russian telecom operator MegaFon will be wrapped with a massive digital "pin screen" that will morph into the shape of any face.
| May 27, 2014
Fire Rated Glass contributes to open lab environment at JSNN
Openness and transparency were high priorities in the design of the Joint School of Nanoscience & Nanoengineering within the Gateway University Research Park in Greensboro, N.C. Because the facility’s nanobioelectronics clean room houses potentially explosive materials, it needed to be able to contain flames, heat, and smoke in the event of a fire. SPONSORED CONTENT
| Mar 26, 2014
Zaha Hadid's glimmering 'cultural hub of Seoul' opens with fashion, flair [slideshow]
The new space, the Dongdaemun Design Plaza, is a blend of park and cultural spaces meant for the public to enjoy.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.
| Mar 7, 2014
Thom Mayne's high-tech Emerson College LA campus opens in Hollywood [slideshow]
The $85 million, 10-story vertical campus takes the shape of a massive, shimmering aircraft hangar, housing a sculptural, glass-and-aluminum base building.
| Mar 4, 2014
CENTRIA Demonstrates Commitment to Contractors
New Brochure Highlights Architectural Metal Panel Manufacturer’s Products, Expertise and Experience