Flameless water and gas install for Noah’s Ark

Sponsored Content Wood

Flameless water and gas install for Noah’s Ark

When you’re building the largest timber-frame structure in the world, you don’t want an open flame anywhere near the construction site. 


By Viega | June 21, 2016

Ark Encounter is the first phase of the AiG theme park

Located in Williamstown, Ky., the Ark Encounter, a 510-foot long wooden boat, is designed to be a family-oriented, historically authentic and environmentally friendly attraction. Created by Answers in Genesis (AiG), a Christian ministry, the Ark Encounter opens in July, 2016, and will bring to life the depictions of the historical events of Noah’s Ark.

The Ark Encounter, a $91.5 million project, is phase one of an entire religious theme park. Additional phases to be completed on the 800-acre site include a pre-flood city, a petting zoo and a walk-through aviary. The Creation Museum, an AiG museum located 40 miles from the Ark, was the first job Applied Mechanical Systems, the mechanical contractor for the Ark, did for AiG.

“They liked our work,” said Brian Hogue, plumbing foreman for Applied Mechanical Systems (AMS). “Our mechanical engineers went to Troyer Group, who is constructing the Ark Encounter, about four years ago and helped their engineering firm with code issues and three years later, when they were ready to start construction, they gave us the job.”

Troyer Group specified the use of Viega ProPress for copper for all the potable water lines, in sizes ranging from ½" to 4", and Viega MegaPressG for the natural gas lines, ranging from ½" to 2".

Ronald Troyer, Senior Vice President of Troyer Group, has included Viega products in various projects. He and Hogue emphasized that the flameless technology and ease of use were the motivating factors for specifying Viega.

 

Flameless install at largest timber-frame structure

 

“The no-heat and no-flame installation of plumbing piping was a definite plus,” said Troyer. “As with most projects of this scale, meeting a tight construction schedule was also a great fit for Viega products. The ease of installation which equated to cost savings with copper pipe was also a plus.”

Hogue agreed and expressed his appreciation for the overall quality of the Viega products and the difference it made on this project.

“Seeing how this is the largest timber frame wood structure in the world, they did not want open flame in the Ark,” Hogue said. “In my opinion, Viega MegaPress and Viega ProPress fittings are built well. There are a lot fewer leaks than other press manufacturers’ fittings. Plus, you save more time, making them cost effective.”

AMS has been installing Viega system solutions in applications where soldering would be prohibitive, and the time saved gives them the opportunity to stay ahead of the game on many jobs. 

“It’s great for shut downs in factories where you don’t have time to worry about draining the system,” Hogue said. “In our Dayton offices, we use it a lot in hospitals, since it is a clean process of joining pipe. I highly recommend Viega systems.”

For more information, visit www.viega.us

Tags

Related Stories

Multifamily Housing | Apr 23, 2018

Mass timber design for multifamily housing

The adaptability of urban development could be revolutionized through the inherent strength of mass timber construction.

Wood | Feb 15, 2018

Japanese company announces plans for the world’s tallest wooden skyscraper

The planned tower would rise 350 meters (1148 feet).

Wood | Feb 5, 2018

The largest timber office building in the U.S. will anchor Newark, N.J. mixed-use development

Michael Green Architecture is designing the building.

Multifamily Housing | Jan 4, 2018

Shigeru Ban’s mass timber tower in Vancouver gets city approval

The 232-foot-tall Terrace House luxury condo development will be the tallest hybrid wood structure in North America.

Sports and Recreational Facilities | Dec 18, 2017

Canada’s newest funicular makes Edmonton’s largest green space more accessible

The incline elevator is located in downtown Edmonton and was publicly funded.

Wood | Nov 30, 2017

The first large-scale mass timber residence hall in the U.S. is under construction at the University of Arkansas

Leers Weinzapfel Associates, Modus Studio, Mackey Mitchell Architects, and OLIN collaborated on the design.

Codes and Standards | Nov 15, 2017

U.S. finalizes tariffs on Canadian softwood lumber

The duties would add 20% or more to cost if trade negotiators can’t find common ground.

Sponsored | Wood | Oct 24, 2017

Multifamily framers recommend AdvanTech® products for flat, even flooring base

With lengthy exposure time, reliably stiff, moisture-resistant subflooring is key in reducing risk of delays.

Green | Aug 11, 2017

A school’s sports hall is created entirely from bamboo

The building boasts a zero-carbon footprint and is naturally ventilated.

Codes and Standards | Jul 27, 2017

Five fire scenarios tested on full-scale mass timber building

Results will help inform code changes.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021