flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

FMI releases 2012 first quarter construction outlook

FMI releases 2012 first quarter construction outlook

The last time construction put in place was at this level was 2000-2001.


By By BD+C Staff | March 20, 2012

FMI released the first-quarter 2012 Construction Outlook Report forecasting a 5% increase in total construction put in place for 2012 compared to 2011, or $826.3 billion. The last time construction put in place was at this level was 2000-2001.

Despite slow growth projections and rising gasoline prices, the GDP is still growing and consumers are still spending, reflected in the Conference Board's Consumer Confidence Index increasing to 70.8 in February compared to 70.4 a year ago. Along with the Federal Reserve's intervention, these factors have served to keep growth slow and inflation in check.

In order for residential construction to achieve the 8 percent increase projected and top $264.4 billion in 2012, a number of factors still have to fall into place:

  • Reduction in the current inventory of homes
  • Lenders willing to lend on reasonable terms
  • Steady improvement in hiring

Projections indicate a 4% increase in nonresidential buildings for 2012, topping $341 billion, with slightly higher growth in 2013 to $361 billion. Nonresidential contractors are facing many of the same problems as residential contractors. In addition, competition is fierce, with low price still the name of the game. Project owners who are ready to restart their building programs are expecting hungry contractors to submit very low bids. One of the keys for growth will be the return of private investment in construction. Additionally, federal, state and local government construction have been dialed back until budgets are in better repair and tax revenues return to levels that are more normal. Research indicates that there are signs this is starting to happen. BD+C

Related Stories

Codes and Standards | Nov 2, 2022

New York City construction official wants to boost design-build

The new associate commissioner of alternative delivery in New York City’s Department of Design and Construction aims to encourage more design-build project delivery in the city.

University Buildings | Nov 2, 2022

New Univ. of Calif. Riverside business school building will support hybrid learning

  A design-build partnership of Moore Ruble Yudell and McCarthy Building Companies will collaborate on a new business school building at the University of California at Riverside.

Building Team | Nov 1, 2022

Nonresidential construction spending increases slightly in September, says ABC

National nonresidential construction spending was up by 0.5% in September, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau.

40 Under 40 | Nov 1, 2022

40 Under 40 class of 2022 winners: Meet the architects

Of the up-and-coming AEC professionals to be named 40 Under 40 class of 2022 winners by the editors of Building Design+Construction, 22 make their living in the architecture profession.

K-12 Schools | Nov 1, 2022

Safety is the abiding design priority for K-12 schools

With some exceptions, architecture, engineering, and construction firms say renovations and adaptive reuse make up the bulk of their work in the K-12 schools sector.

| Nov 1, 2022

Updated Florida building codes helped newer homes withstand Hurricane Ian

Newer homes seemed to fare much better than older structures during Hurricane Ian, suggesting that updated Florida building codes made a difference.

Wood | Nov 1, 2022

A European manufacturer says its engineered wood products can store carbon for decades

  Metsä Wood, a Finland-based manufacturer of engineered wood products, says its sustainable, material-efficient products can store carbon for decades, helping to combat climate change. 

Data Centers | Oct 31, 2022

Data center construction facing record-breaking inflation, delays

Data center construction projects face record-breaking inflation amid delays to materials deliveries and competition for skilled labor, according to research from global professional services company Turner & Townsend.

School Construction | Oct 31, 2022

Claremont McKenna College science center will foster integrated disciplinary research

  The design of the Robert Day Sciences Center at Claremont McKenna College will support “a powerful, multi-disciplinary, computational approach to the grand socio-scientific challenges and opportunities of our time—gene, brain, and climate,” says Hiram E. Chodosh, college president.

Energy Efficient Roofing | Oct 28, 2022

Rooftop mini turbines can pair with solar panels

A new type of wind turbine can pair well on roofs with solar panels, offering a double source of green energy generation for buildings.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021