A Form and Function Upgrade for New Forensic Facility

Sponsored Content Metals

A Form and Function Upgrade for New Forensic Facility


By Metl-Span | October 15, 2021
Northampton Forensics

Northampton County in Nazareth, Pennsylvania, had a forensics problem. Its Coroner’s Office had been housed in a cramped, outmoded space, one that did not lend itself to the sensitive operations such a facility should be capable of. Additionally, those who worked at the Coroner’s Office found themselves needing to drive around to local hospitals and medical centers to conduct its critical work. 

The new Northampton County Forensic Center, an $11 million state-of-the-art facility constructed at 300 Gracedale Ave. in Upper Nazareth Township, solved these problems … and then some. As reported on LehighValleyLive.com, “The new 27,847-square-foot facility includes autopsy rooms with viewing areas to accommodate law officers and medical students; a digital forensic lab; lockers to secure evidence; a five-bay garage; and offices for the staff of county Coroner Zachary Lysek. It also includes a private reception room for family members coming to view their deceased loved ones.”

Builder/installer and longtime Metl-Span dealer, CHM Contracting, LLC, based in Leesport, Pennsylvania, along with project architect W2A Design Group and the general contractor, 
Sordoni Construction, found the ideal building materials solution in Metl-Span 5” CF42R insulated metal roof panels and 4” CF42 insulated metal wall panels

 

Performance and Installation Expertise

According to Steve Chando, Vice President of CHM Contracting, “The 5” CF42R allowed the building to be under roof in 12 working days, which then allowed other contractors to proceed with their work. Insulated metal panels, in general, are advantageous to the overall completion of a project because you have a complete weathertight system as soon as panels are set.”

Further, says Jake Kozak, CHM’s Project Manage/Estimator, “Since you have a 42-inch-wide panel that runs the full length of the roof, you get optimum coverage, which allows for a very quick install.” Some roof panels, in fact, were as long as 51 feet.CHM used a crane and a vacuum rig to set the roof panels, underscoring the magnitude of the engineering involved with the process. 

Northampton Forensics

Kozak continues, “Also of note, with a conventional building, the framing goes up, then the exterior sheathing goes up, followed by the air vapor barrier, and another layer of girts. There are just so many layers and so many people to coordinate, it just drags out the schedule and complicates installation. But with single-sourcing, like with this project, the exterior wall system can be installed with a single contractor, which is a huge advantage to everyone involved.”

Chris Devers, Sales Representative with Exterior Building Solutions for Metl-Span, adds that having one qualified contractor on the job, with the experience that CHM brings to the table, is key. “They do a great job,” he says. This wasn't something where just anybody could just come on-site and put this together. To have one contractor come in there and cover all the bases, from the exterior shell to the interior finish, it was incredibly impressive to watch.”

Additionally, in terms of the wall panels, the uncompromising ability for the insulated CF42 Metl-Span metal wall panels to integrate seamlessly with other aspects of the construction—for example, Airolite louvers, drop-in window units, overhead doors, and man doors—supported a cost-effective and relatively easy installation process.

Kozak shares that the louvers, in particular, worked out well for this project because CHM was able to install the Metl-Span panels and cut out afterwards, which kept the building weathertight while the crew was waiting on other contractors. Since the building was weathertight, CHM was able to come back and attend to additional detail afterwards.

As for additional benefits of the Metl-Span wall panels on the interior, some panels were exposed, and due to the nature of the building’s use, it was important to have a surface that's easily cleaned and maintained.

Moreover, the timely delivery of materials also allowed for a quick and efficient installation. In fact, the project was field measured in May 2020, installation started in June 2020 and the installation was complete by Oct. 1, 2020. 

 

A Commercial Look for an Industrial Structure

Regarding the desired building aesthetic, with both the wall and roof panels, the design team was looking for a striated embossed type of finish. There were also complementary colors of wall panel, Smoke Grey, Sandstone, and Zinc Grey, which gave it an integrated look but with different color aspects. 

For the Zinc Grey roof panels, they wanted the look of a standing seam metal roof application but with the performance of an insulated metal panel. “For the roof,” Chando says, “you’ve got both aspects—a good insulating high R value with the 5” panel, as well as the standing seams at all of the jointing applications.”

With the color scheme and textured panels, the end result was more of a commercial-looking structure as opposed to industrial, in spite of the fact that the building’s basic use is as a morgue. Kozak says, “It’s not a cold feeling building. It doesn’t look like a morgue when you drive by, which is something that was important to the design team. It sits right next to Gracedale nursing home, which is a fairly significant architectural feature in the area.”

Northampton Forensics

Chando adds, “It’s in the middle of a field, on a piece of farmland, so they wanted it to look nice, nothing that looked like a farm building. It doesn’t look industrial. Rather, it looks like it’s part of the complex.”

Chando summarizes, “The finished Metl-Span installation is great example of how multiple finishes and textures of the same panel can produce a high-end architectural appearance, all while meeting the owner’s utilitarian needs.” 


Project Details:
Project Name: Northampton County Forensic Center
Location: Nazareth, PA
Architect: W2A Design Group 
General Contractor: Sordoni Construction
Installer: CHM Contracting LLC

Metl-Span Products:
Wall panels: 4” CF42 – Smoke Grey, Sandstone, Zinc Grey, 12,800 SF
Roof panels: 5” CF42R – Zinc Gray LG, (26,716 SF)

Related Stories

Sponsored | Metals | Nov 6, 2017

A dream project

The dream came to life by joining together four Star metal buildings and adding a whole lot of TLC.

Sponsored | Metals | Oct 18, 2017

Standing up to Hurricane Irma

Star metal building systems have once again demonstrated their durability in extreme weather events.

Sponsored | Metals | Oct 9, 2017

Dual-purpose paneling redefines the building envelope for transportation solutions leader

Metl-Span® insulated metal panels provide insulation and aesthetic advantages.

Sponsored | Metals | Oct 6, 2017

Build a better building: The importance of using the right composite material

MCM has been around since the early 70s and has proven to be one of the most versatile architectural cladding products available.

Sponsored | Cladding and Facade Systems | Oct 5, 2017

Richland Two Institute of Innovation

Five colors of metal wall panels highlight design of multigenerational learning center.

Sponsored | Metals | Sep 26, 2017

A new lease on life for The Gin at the Co-Op District

The city specified the modern era’s leading sustainability features, but also requested a façade that harkened back to its agricultural roots.

Sponsored | Metals | Sep 11, 2017

Metal wall panels create diverse portfolios

Although square and rectangular wall panels have been the norm, new shape and texture trends are emerging.

Metals | Aug 17, 2017

Exterior metal panels complement performing arts center’s maple interior

Two Petersen Aluminum profiles were used in the design of the project.

Sponsored | Coatings | Aug 16, 2017

Architectural details offer endless inspiration

Railings, screens, canopies, and shading devices punctuate projects and are important aspects of the built environment.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021