A Form and Function Upgrade for New Forensic Facility

Sponsored Content Metals

A Form and Function Upgrade for New Forensic Facility


By Metl-Span | October 15, 2021
Northampton Forensics

Northampton County in Nazareth, Pennsylvania, had a forensics problem. Its Coroner’s Office had been housed in a cramped, outmoded space, one that did not lend itself to the sensitive operations such a facility should be capable of. Additionally, those who worked at the Coroner’s Office found themselves needing to drive around to local hospitals and medical centers to conduct its critical work. 

The new Northampton County Forensic Center, an $11 million state-of-the-art facility constructed at 300 Gracedale Ave. in Upper Nazareth Township, solved these problems … and then some. As reported on LehighValleyLive.com, “The new 27,847-square-foot facility includes autopsy rooms with viewing areas to accommodate law officers and medical students; a digital forensic lab; lockers to secure evidence; a five-bay garage; and offices for the staff of county Coroner Zachary Lysek. It also includes a private reception room for family members coming to view their deceased loved ones.”

Builder/installer and longtime Metl-Span dealer, CHM Contracting, LLC, based in Leesport, Pennsylvania, along with project architect W2A Design Group and the general contractor, 
Sordoni Construction, found the ideal building materials solution in Metl-Span 5” CF42R insulated metal roof panels and 4” CF42 insulated metal wall panels

 

Performance and Installation Expertise

According to Steve Chando, Vice President of CHM Contracting, “The 5” CF42R allowed the building to be under roof in 12 working days, which then allowed other contractors to proceed with their work. Insulated metal panels, in general, are advantageous to the overall completion of a project because you have a complete weathertight system as soon as panels are set.”

Further, says Jake Kozak, CHM’s Project Manage/Estimator, “Since you have a 42-inch-wide panel that runs the full length of the roof, you get optimum coverage, which allows for a very quick install.” Some roof panels, in fact, were as long as 51 feet.CHM used a crane and a vacuum rig to set the roof panels, underscoring the magnitude of the engineering involved with the process. 

Northampton Forensics

Kozak continues, “Also of note, with a conventional building, the framing goes up, then the exterior sheathing goes up, followed by the air vapor barrier, and another layer of girts. There are just so many layers and so many people to coordinate, it just drags out the schedule and complicates installation. But with single-sourcing, like with this project, the exterior wall system can be installed with a single contractor, which is a huge advantage to everyone involved.”

Chris Devers, Sales Representative with Exterior Building Solutions for Metl-Span, adds that having one qualified contractor on the job, with the experience that CHM brings to the table, is key. “They do a great job,” he says. This wasn't something where just anybody could just come on-site and put this together. To have one contractor come in there and cover all the bases, from the exterior shell to the interior finish, it was incredibly impressive to watch.”

Additionally, in terms of the wall panels, the uncompromising ability for the insulated CF42 Metl-Span metal wall panels to integrate seamlessly with other aspects of the construction—for example, Airolite louvers, drop-in window units, overhead doors, and man doors—supported a cost-effective and relatively easy installation process.

Kozak shares that the louvers, in particular, worked out well for this project because CHM was able to install the Metl-Span panels and cut out afterwards, which kept the building weathertight while the crew was waiting on other contractors. Since the building was weathertight, CHM was able to come back and attend to additional detail afterwards.

As for additional benefits of the Metl-Span wall panels on the interior, some panels were exposed, and due to the nature of the building’s use, it was important to have a surface that's easily cleaned and maintained.

Moreover, the timely delivery of materials also allowed for a quick and efficient installation. In fact, the project was field measured in May 2020, installation started in June 2020 and the installation was complete by Oct. 1, 2020. 

 

A Commercial Look for an Industrial Structure

Regarding the desired building aesthetic, with both the wall and roof panels, the design team was looking for a striated embossed type of finish. There were also complementary colors of wall panel, Smoke Grey, Sandstone, and Zinc Grey, which gave it an integrated look but with different color aspects. 

For the Zinc Grey roof panels, they wanted the look of a standing seam metal roof application but with the performance of an insulated metal panel. “For the roof,” Chando says, “you’ve got both aspects—a good insulating high R value with the 5” panel, as well as the standing seams at all of the jointing applications.”

With the color scheme and textured panels, the end result was more of a commercial-looking structure as opposed to industrial, in spite of the fact that the building’s basic use is as a morgue. Kozak says, “It’s not a cold feeling building. It doesn’t look like a morgue when you drive by, which is something that was important to the design team. It sits right next to Gracedale nursing home, which is a fairly significant architectural feature in the area.”

Northampton Forensics

Chando adds, “It’s in the middle of a field, on a piece of farmland, so they wanted it to look nice, nothing that looked like a farm building. It doesn’t look industrial. Rather, it looks like it’s part of the complex.”

Chando summarizes, “The finished Metl-Span installation is great example of how multiple finishes and textures of the same panel can produce a high-end architectural appearance, all while meeting the owner’s utilitarian needs.” 


Project Details:
Project Name: Northampton County Forensic Center
Location: Nazareth, PA
Architect: W2A Design Group 
General Contractor: Sordoni Construction
Installer: CHM Contracting LLC

Metl-Span Products:
Wall panels: 4” CF42 – Smoke Grey, Sandstone, Zinc Grey, 12,800 SF
Roof panels: 5” CF42R – Zinc Gray LG, (26,716 SF)

Related Stories

Sponsored | Roofing | Jun 29, 2017

Metal roofs are soaring in popularity in the residential market

The Metal Roofing Alliance estimates that 750,000 metal roofs were installed on U.S. homes in 2015.

Sponsored | Metals | Jun 15, 2017

Inside-out cheese-making: 12,000-sf metal building features an unusual exoskeleton design

In order to maintain hygienic cleanliness inside the facility, smooth, continuous wall surfaces with a minimum number of joints, indents or protrusions is desirable.

| Jun 13, 2017

Accelerate Live! talk: Driving value through process innovation, Jonathan O'Leary, NCI Building Systems (sponsored)

NCI Building Systems’ Jonathan O'Leary discusses why AEC firms must rely on their partners to simplify the business process and minimize risk.

Sponsored | Roofing | May 24, 2017

Duro-Last Duro-Bond Roofing System installed on New England warehouse

Breault Roofing created a way to make the installation process more efficient by requesting mostly tabless sheets and fastening the membrane with induction welding to the purlins instead of a regular mechanically fastened system onto the pan.

Sponsored | Metals | May 22, 2017

Tapered columns can slim down costs

In many metal building applications, straight columns may have more steel than they need.

Sponsored | Coatings | May 5, 2017

Butler Tech Bioscience Center features hands-on learning in bold new building

Butler Tech students can now study and work in neighboring buildings that feature ALPOLIC metal panels coated in Valspar’s Valflon®. 

Sponsored | Metals | May 3, 2017

Steel protection methods

There are robust, well-proven ways to protect steel so it can perform up to its potential virtually indefinitely.

Sponsored | Metals | Apr 28, 2017

Colorful corrugated wall panels provide bright new look for community library

Approximately 2,600 sq. ft. of PAC-CLAD 7/8” Corrugated Panels in five different colors was just what the design team was looking for.

Sponsored | Coatings | Apr 27, 2017

Community center makes a statement in West Sacramento

It takes a team to find the perfect color combination, and this time we accomplished it with the help of CENTRIA.

Sponsored | Roofing | Mar 21, 2017

Duro-Last provides solution for Kentucky elementary school's leaky roof

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021