flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Foster + Partners-designed towers approved as part of massive neighborhood redevelopment in San Francisco

High-rise Construction

Foster + Partners-designed towers approved as part of massive neighborhood redevelopment in San Francisco

One of Oceanwide Center’s buildings will be the city’s second tallest. 


By John Caulfield, Senior Editor | May 17, 2016

The ground floors of Oceanwide Center's two towers will be lifted up five stories to create an “urban room” with pedestrian crossings. Image: Foster + Partners

A November groundbreaking is scheduled for the 2.3-million-sf Oceanwide Center in San Francisco that, when completed, will be part of this city’s ambitious creation of a new Transbay neighborhood that includes more than 6 million sf of new downtown office space in a high-density commercial core surrounding the new five-story Transbay Transit Center.

The San Francisco Planning Commission has granted planning permission for Oceanwide Center, consisting of two towers—a 605-foot-high building for a hotel and residences, and an 850-foot-tall office and residential building—that will be located within a 22,000-sf lot in the South of Market Street (SOMA) district. The designers are Foster + Partners and Heller Manus Architects.

Foster + Partners states that this project will include new public spaces and pedestrian connections that are designed to support increased density, which is one of the goals of the larger Transbay development. Kathryn Gustafson of the firm Gustafson Guthrie Nichol is Oceanwide Center’s landscape architect.

The ground level of the buildings will be “lifted up” by almost five stories to provide the neighborhood with an “urban room” with walking routes cutting through the site, and leading to shops, cafes, and green spaces.

“This development will be the new exemplar of urban living with exciting places to live and work right alongside the central transport hub,” sayd Stefan Behling, Foster + Partners’ Senior Executive Partner.  

Beijing-based Oceanwide Holdings acquired this site in early 2015, according to the website Hoodline.com. The plans would require tearing down three buildings. The developer also intends to renovate two existing commercial buildings on First Street. Hoodline reports that Oceanwide Center will include 265 residential units, 169 hotel rooms, 12,500 sf of ground-floor retail, and 26,000 sf of privately owned public open space.

The Transbay Redevelopment Project has three interconnected elements:

  • Replacing the former Transbay Terminal at First and Mission Streets
  • Extending Caltrain and California High Speed Rail underground from Caltrain’s current terminal at 4th and King Streets into the new downtown Transit Center
  • Creating a new neighborhood of homes, offices, parks, and shops surround the Transit Center.

The first phase will create a new five-story Transit Center with one above-grade bus level, ground-floor, concourse, and two below-grade rail levels serving Caltrain and future California High Speed Rail. Phase I will also create new bus ramp that will connect the Transit Center to a new off-site bus storage facility and the San Francisco-Oakland Bay Bridge.

The Transit Center is designed by Pelli Clarke Pelli Architects (PCPA), and will feature a 5.4-acre park on the roof of the bus and rail station. A complementary transit tower designed by PCPA and developed by Hines will be built adjacent to the Transit Center and will provide additional financing for the project.

Aside from the new office space, other highlights of the Transbay redevelopment plan include:

  • Nearly 4,400 units of new housing, 1,200 of which will be permanently affordable.
  • Approximately 100,000 sf of new retail space, much of it in the Transbay Transit Center.
  • Nearly 1,000 new hotel rooms.
  • A dramatic new skyline punctuated by a limited number of taller buildings, including a 1,070-foot-tall Salesforce Tower, the tallest in San Francisco, adjacent to the Transbay Transit Center.
  • Wide sidewalks with landscaping, lighting, seating, and pedestrian amenities.
  • Mid-block crossings keyed to alleyway systems and other pedestrian safety improvements.
  • Safe and convenient bicycle lanes.
  • A total of more than 11 acres of new public parks and open space.

According to the San Francisco Planning Department, the Transit Center District Plan and the Transbay Redevelopment Plan will generate more than $2.7 billion in net additional public funding for the construction of the Transbay Program and affordable housing in the Transbay neighborhood. Together, the Plans will generate more than 25,000 construction job-years and 27,000 permanent jobs.

 

One of Oceanwide Center's towers, at 805 feet, will be the second tallest in San Francisco. Image: Foster + Partners

 

 

Related Stories

High-rise Construction | Jun 29, 2016

Best Tall Buildings around the world favor unusual shapes and hybrid functions

The Council on Tall Buildings and Urban Habitat selects winners in four regions.

High-rise Construction | Jun 28, 2016

CTBUH names winners and finalists for 2016 Tall Building Awards

Eight winners were named in five categories that recognized tall buildings, urban habitats, innovation, performance, and decade-long excellence.

High-rise Construction | Jun 15, 2016

WilkinsonEyre designs diamond-patterned Bay Park Centre for Toronto

A sloping plaza with trees, grass, and gardens connects the two downtown towers.

Sponsored | High-rise Construction | Jun 13, 2016

Marilyn Monroe’ tower adds curves to the Toronto skyline

Made of glass, concrete, and steel, the 56-story tower has been dubbed the "Marilyn Monroe" because of its curving lines.

High-rise Construction | Jun 7, 2016

Gensler’s Gateway Tower picks up where Calatrava's Chicago Spire left off

A new 2,000-foot tower has been proposed for a site that is currently a non-monument to an abandoned plan.

Codes and Standards | May 25, 2016

LEED Dynamic is worth the effort, says commercial real estate executive

San Diego office tower is California’s first office building to receive LEED Dynamic plaque in recertification.  

Building Team Awards | May 20, 2016

Pittsburgh's Tower at PNC Plaza raises the bar on high-rise greenness

The Building Team designed the 800,000-sf tower to use 50% less energy than a comparable building. A 1,200-sf mockup allowed the team to test for efficiency, functionality, and potential impact on the building’s occupants.

Green | May 16, 2016

Development team picked for largest Passive House project in North America

The 24-story curved building would be 70% more efficient than comparable housing in New York City.

High-rise Construction | May 2, 2016

UPDATED* Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

The 1,186-foot tower will be the third-tallest building in the city.  

Wood | Apr 29, 2016

Anders Berensson Architects designs 40-story wooden skyscraper for Stockholm

The structure, which will be made entirely out of cross-laminated timber, will rise 436 feet into the air, making it Stockholm’s tallest building.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021