flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Foster + Partners’ Mexico City Airport has been cancelled

Airports

Foster + Partners’ Mexico City Airport has been cancelled

The project was set to cost $13.3 billion.


By David Malone, Associate Editor | October 31, 2018
Mexico City AIrport

Courtesy Foster + Partners

Foster + Partners’ ambitious Mexico City Airport project has officially been cancelled after 70% of voters (only 1.2% of registered voters turned out) rejected the project. The new plan is to keep the existing airport and add a terminal and two runways to a military base north of Mexico City, according to The Wall Street Journal.

 

See Also: Foster + Partners, Fernando Romero win competition for Mexico City's newest international airport

 

The original plans called for a 555,000 sm facility that would have become one of the largest airports in the world. It was also designed to be the most sustainable airport in the world, as the single terminal, which would have been enclosed within a continuous lightweight gridshell, would have used fewer materials and less energy than a cluster of buildings.

Mexico’s President-elect, Andrés Manuel López Obrador, suggested the partly-built airport structure could be repurposed as a sports and ecological center.

Tags

Related Stories

| Aug 11, 2010

Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms

A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Earthquake engineering keeps airport grounded

Istanbul, Turkey's new 2.15 million-sf Sabiha Gökçen International Airport opened on October 31, 2009, becoming the world's largest seismically isolated building. Arup's global airport planning and engineering team, in collaboration with architects Dogan Tekeli Sami Sisa Mimarlik Ofisi and contractor LIMAK-GMR JV, working within an 18-month timeline, designed and built the facility wi...

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021