flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fully electric Oregon elementary school aims for resilience with microgrid design

K-12 Schools

Fully electric Oregon elementary school aims for resilience with microgrid design

River Grove Elementary School is one of the first American schools to feature a microgrid design.


By Peter Fabris, Contributing Editor | April 30, 2024
River Grove Elementary School in Oregon Rendering: Arcadis
Rendering: Arcadis

River Grove Elementary School in Lake Oswego, Ore., was designed to be fully electric and resilient to natural disasters such as seismic events, storms, and wildfire. The roughly 78,000-sf school in a Portland suburb will feature a microgrid—a small-scale power grid that can operate independently from the area’s electric grid.

Design of the microgrid system was developed through a collaboration between the school district and the local utility provider. River Grove will be one of the first American schools to be constructed with a microgrid.

The structure is designed to a higher seismic factor as a Category IV building to serve as a resource for the local community in the event of an earthquake or other natural disaster. Portions of the building will continue to function during a prolonged power outage thanks to the large photovoltaic array and battery energy storage system.

The building has a sophisticated heating, cooling, and ventilation system, a critical feature in an area experiencing soaring temperatures during heatwaves in recent years. The region has also been impacted by smoke-filled air from forest fires and ice storms causing power outages for weeks.

River Grove is a replacement of a 1967 elementary school that existed on the same site. The previous 68,846 sf school was fully demolished, and students moved off-site to another school during construction.

The new school will provide classrooms, extended learning areas, an innovation lab, music room, stage, library, administration offices, gymnasium, kitchen, an outdoor covered play area, outdoor learning spaces, and play fields. The building is designed for a capacity of 600. The previous facility had a capacity of 575.

Construction kicked off in June 2022, with completion expected for the school’s opening in Fall 2024.

Owner and/or Developer: Lake Oswego School District
Design Architect: Arcadis
Architect of Record: Arcadis
MEP Engineer: Glumac
Structural Engineer: KPFF
General Contractor: Triplett Wellman  

River Grove Elementary School in Oregon Rendering: Arcadis
Rendering: Arcadis
River Grove Elementary School in Oregon Rendering: Arcadis
Rendering: Arcadis
River Grove Elementary School in Oregon Rendering: Arcadis
Rendering: Arcadis

Related Stories

K-12 Schools | May 17, 2019

Tall schools, tight spaces: Giving students access to the outdoors requires considerable creativity

Verticality has some plusses, according to AEC firms that have engaged such projects recently.

K-12 Schools | Apr 25, 2019

How outdoor environments provide value to K-12 learning, health, and safety

Outdoor spaces at school offer students key opportunities to learn, problem solve, and mentally refresh.

K-12 Schools | Jan 21, 2019

Safer K-12 design: School should feel – and look – like school

In an age during which stories of bullying, school shootings, and mental health concerns are all too common, designers have a critical role to play in crafting K-12 schools that simultaneously promote engaged learning and student safety.

K-12 Schools | Nov 5, 2018

Modernizing schools is paying off in creating better learning and teaching environments

A new paper reports on a recent study of nine schools in Washington DC that gauged occupants’ perceptions.

K-12 Schools | Jul 26, 2018

K-12 market trends 2018: Common areas enable hands-on learning

Modern designs emphasize social and collaboration spaces outside the classroom.

| May 30, 2018

Accelerate Live! talk: From micro schools to tiny houses: What’s driving the downsizing economy?

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), micro-buildings design expert Aeron Hodges, AIA, explores the key drivers of the micro-buildings movement, and how the trend is spreading into a wide variety of building typologies.

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

K-12 Schools | Jan 25, 2018

Cost estimating for K-12 school projects: An invaluable tool for budget management

Clients want to be able to track costs at every stage of a project, and cost estimates (current and life cycle) are valuable planning and design tools, writes LS3P's Ginny Magrath, AIA.

K-12 Schools | Jan 24, 2018

Hawaii’s first net-zero public school

G70 is the architect, planner, and civil engineer of record for the project.

K-12 Schools | Jan 22, 2018

Innovative learning environments and our ‘Heschong Mahone moment’

An education market think tank proposes a radical research concept for evaluating learning environments.

boombox1
boombox2
native1

More In Category



K-12 Schools

Designing for dyslexia: How architecture can address neurodiversity in K-12 schools

Architects play a critical role in designing school environments that support students with learning differences, particularly dyslexia, by enhancing social and emotional competence and physical comfort. Effective design principles not only benefit students with dyslexia but also improve the learning experience for all students and faculty. This article explores how key design strategies at the campus, classroom, and individual levels can foster confidence, comfort, and resilience, thereby optimizing educational outcomes for students with dyslexia and other learning differences.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021