flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Future-proofing BIM: A White Paper presented by Dell and BD+C

Future-proofing BIM: A White Paper presented by Dell and BD+C

Creating a Robust Environment for Successful Building Information Modeling.


March 15, 2011
Future-proofing BIM

To benefit from new building design and construction technologies as well as novel project management approaches, leading AEC organizations of all sizes and scales are deploying building information modeling (BIM). While the benefits and methods of BIM systems are well accepted, there are important questions about the most suitable hardware and network environments for BIM. Effective transition approaches to upgrade workstations for BIM have been implemented by a growing number of AEC companies.
 
Leading experts in BIM technology and application have demonstrated how high performance graphics workstations (HPGWs) can be used to enhance productivity, IT life cycle, and full project integration. Experience from AEC firm managers and IT leaders – BIM managers – from small- and medium-sized organizations have shown how successful BIM hardware adoption can be achieved. Their conclusions are relevant to AEC firms of all sizes.
 
The White Paper presents the comparative benefits of various kinds of hardware specification, with some guidance on the proper selection and specification of BIM workstations. Compatibility with existing standards, such as software types and project workflow, are outlined. Advice on adoption strategy is reviewed, such as the phased introduction of BIM workstations and expectations for cost control and ROI on preferred, higher-end systems.

Order your free copy today.

Related Stories

| Oct 4, 2012

2012 Reconstruction Awards Gold Winner: Wake Forest Biotech Place, Winston-Salem, N.C.

Reconstruction centered on Building 91.1, a historic (1937) five-story former machine shop, with its distinctive façade of glass blocks, many of which were damaged. The Building Team repointed, relocated, or replaced 65,869 glass blocks.

| Oct 4, 2012

Electronic power tool builds project transparency

As building projects have grown in scope and complexity, so, too, has the task of document management. A new online tool is helping Building Teams meet that demand.

| Aug 8, 2012

BIM’s future up in the cloud

The AEC industry is on the cusp of a still more significant evolution with cloud computing.

| Jul 9, 2012

Integrated Design Group completes UCSB data center

Firm uses European standard of power at USCB North Hall Research Data Center.

| Jul 3, 2012

Trimble to acquire WinEstimator

Acquisition adds estimating software solutions to Meridian Systems’ portfolio.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| Jun 1, 2012

Caruso to lead Gensler’s Asia talent development

Caruso will be based in Shanghai and working with the Gensler offices in Japan, China, South Korea, Singapore, Thailand, and India until the spring of 2013.

| Jun 1, 2012

New York City Department of Buildings approves 3D BIM site safety plans

3D BIM site safety plans enable building inspectors to take virtual tours of construction projects and review them in real-time on site.

| May 31, 2012

8 steps to a successful BIM marketing program

It's not enough to have BIM capability--you have to know how to sell your BIM expertise to clients and prospects.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021