flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

George W. Bush Presidential Center achieves LEED Platinum certification

George W. Bush Presidential Center achieves LEED Platinum certification

The Bush Center is the first presidential library to achieve LEED Platinum certification under New Construction.


By George W. Bush Presidential Center | April 11, 2013

The George W. Bush Presidential Center announced today it has earned Platinum certification by the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) program. The Bush Center is the first presidential library to achieve LEED Platinum certification under New Construction (v2009).

“As we approach the Bush Center’s April 25 dedication, we are proud to be recognized for our emphasis on sustainable building design,” said Mark Langdale, President of the George W. Bush Presidential Center. “The Bush Center and our ongoing work are a reflection of the principles that guided President and Mrs. Bush in their public service, including their longstanding commitment to conservation and caring for the land.”

The LEED Green Building Certification System encourages the use of designs, materials and systems that are sustainable, energy efficient and reduce a facility’s impact on the environment and human health. The Bush Center features green roofing systems to reduce heating and cooling demands, solar panels for producing electricity and hot water, building materials sourced from the region to lower transportation impacts, and rainwater recycling that will meet 50 percent of the irrigation needs of the native Texas landscaping.

Regionally sourced building materials used in the Bush Center include Texas Cordova cream limestone from Central Texas, Permian sea coral limestone from near the Bushes’ hometown of Midland, Texas, stained pecan wood interior paneling, and Texas mesquite hardwood floors.

A 15-acre urban park surrounds the Bush Center and allows visitors to experience a distinctive, native Texas landscape in the heart of a major city. The project restored the land’s native habitat by planting more than 70 percent of the site, including more than 900 trees, 40 of which were transplanted from the Bushes’ Prairie Chapel Ranch in Crawford, Texas. The Bush Center’s landscaping includes a prairie and savannah planted with five drought-tolerant grasses, and a wildflower meadow, featuring Texas wildflowers such as bluebonnets.

For more information on the Bush Center’s LEED features, please see the attached fact sheet, or visit the Bush Center online at www.bushcenter.org.

Related Stories

| Sep 26, 2016

RELIGIOUS FACILITY GIANTS: A ranking of the nation’s top religious sector design and construction firms

Gensler, Leo A Daly, Brasfield & Gorrie, Layton Construction, and AECOM top Building Design+Construction’s annual ranking of the nation’s largest religious facility AEC firms, as reported in the 2016 Giants 300 Report.

Architects | Sep 26, 2016

Explore the world through architectural adventures

A new travel program offers design enthusiast travelers 10 global destinations.

Architects | Sep 21, 2016

DLR Group broadens its practice range and market penetration with addition of Westlake Reed Leskosky

The merger, say company officials, creates “a global design leader” in a consolidating industry.

Architects | Sep 21, 2016

Design for the transition from thinking to creating

While heads-down work continues, the changing nature of learning and work has resulted in a shift toward frequent and spontaneous exchanges.

Codes and Standards | Sep 21, 2016

Healthy buildings becoming a key design priority for both architects and building owners

Nationwide survey finds nearly three of four architects cite health impacts influencing design decisions

Cultural Facilities | Sep 19, 2016

International competition recognizes insect-inspired design for Moscow Circus School

The proposal would make the school’s activities more transparent to the public.

Architects | Sep 19, 2016

A workplace designed for the innovation economy

Over the past 100 years, how we work has changed dramatically, and these changes have impacted workplace design.

Architects | Sep 16, 2016

Former architect now builds architectural wonders out of LEGO blocks

Adam Reed Tucker’s creations are currently on display at the Museum of Science and Industry.

Architects | Sep 15, 2016

Implicit bias: How the unconscious mind drives business decisions

Companies are tapping into the latest research in psychology and sociology to advance their diversity and inclusion efforts when it comes to hiring, promoting, compensation, and high-performance teaming, writes BD+C's David Barista.

Museums | Sep 14, 2016

Architectural model museum opens in Japan

The museum includes models from Japanese architects including Shingeru Ban, Kengo Kuma, and Riken Yamamoto.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021