flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Giants 300 Science & Technology Report

Giants 300 Science & Technology Report

BD+C's Giants 300 Top 25 AEC Firms in the Science & Technology sector.


By Posted by Tim Gregorski, Senior Editor | August 8, 2012
Building Team: DGA Builders (CM), Bergmann Associates (EA), Kennedy Mechanical (
Building Team: DGA Builders (CM), Bergmann Associates (EA), Kennedy Mechanical (mechanical engineer), and Billitier Electric (el
This article first appeared in the August 2012 issue of BD+C.

Students work in the undergraduate chemistry classroom, in the University of Rochester’s Hutchison Hall, a structure originally built in the 1960s.

Constructed in three months at a cost of $1.5 million, the 2,265-sf laboratory is a prototype for future development at the university. According to Joseph Dinnocenzo, professor of chemistry at the University of Rochester, the lab was designed to bring together the three phases of experimental work: design, execution, and analysis.

 

TOP 25 SCIENCE & TECHNOLOGY SECTOR ARCHITECTURE FIRMS

Rank Company 2011 Science & Technology Revenue ($)
1 HDR Architecture 60,900,000  
2 Perkins+Will 54,976,710  
3 HOK 39,049,209  
4 Flad Architects 35,280,000  
5 SmithGroupJJR 31,200,000  
6 Payette 17,207,046  
7 Ballinger 10,940,133  
8 EwingCole 10,000,000  
9 S/L/A/M Collaborative, The 7,895,193  
10 NBBJ 7,394,000  
11 PageSoutherlandPage 7,038,000  
12 BSA LifeStructures 6,339,395  
13 Ennead Architects 5,890,000  
14 Gensler 4,100,000  
15 Harley Ellis Devereaux 3,600,000  
16 OZ Architecture 3,006,974  
17 Wight & Company 2,959,100  
18 ZGF Architects 2,781,476  
19 Ware Malcomb 2,264,000  
20 Kirksey Architecture 2,108,182  
21 Reynolds, Smith and Hills 2,100,000  
22 Lord, Aeck & Sargent 1,445,819  
23 Perkins Eastman 1,300,000  
24 SMMA|Symmes Maini & McKee Associates 1,217,481  
25 IBI Group 1,206,499  

 

TOP 25 SCIENCE & TECHNOLOGY SECTOR ENGINEERING FIRMS

Rank Company 2011 Science & Technology Revenue ($)
1 Jacobs 692,920,000
2 M+W U.S. 105,132,043
3 Stantec 42,300,000
4 Affiliated Engineers 14,482,000
5 Middough 12,500,000
6 URS Corp. 11,485,000
7 Bard, Rao + Athanas Consulting Engineers 10,000,000
8 R.G. Vanderweil Engineers 8,231,300
9 Merrick & Co. 6,150,000
10 Bergmann Associates 5,300,000
11 RMF Engineering 4,500,000
12 WSP USA 4,200,000
13 Smith Seckman Reid 4,070,000
14 Clark Nexsen 4,046,032
15 STV 3,082,000
16 SSOE Group 3,043,000
17 Thornton Tomasetti 1,792,193
18 ccrd partners 1,250,000
19 RMH Group, Inc., The 1,192,171
20 RDK Engineers 1,092,000
21 Wiss, Janney, Elstner Associates 1,037,000
22 KPFF Consulting Engineers 1,000,000
23 AKF Group 1,000,000
24 Paulus, Sokolowski and Sartor 1,000,000
25 Karpinski Engineering 868,947

 

TOP 25 SCIENCE & TECHNOLOGY SECTOR CONSTRUCTION FIRMS

Rank Company 2011 Science & Technology Revenue ($)
1 Whiting-Turner Contracting Company, The 704,586,928
2 Jacobs 692,920,000
3 Turner Corporation, The 270,000,000
4 DPR Construction 260,132,313
5 Manhattan Construction Group 203,632,000
6 JE Dunn Construction 147,553,307
7 Lend Lease 135,276,349
8 Structure Tone 105,970,000
9 Tutor Perini 68,084,000
10 Layton Construction 45,300,000
11 E.W. Howell Co. 43,137,000
12 McCarthy Holdings 41,000,000
13 Weitz Company, The 39,314,126
14 Messer Construction Co. 28,777,706
15 Coakley & Williams Construction 22,023,492
16 Flintco 20,800,000
17 Gilbane Building 17,822,000
18 Choate Construction 15,422,770
19 S. M. Wilson & Co. 12,268,944
20 Linbeck Group 12,000,000
21 URS Corp. 11,485,000
22 CORE Construction 8,242,587
23 McShane Companies, The 8,000,000
24 Yates Companies, Inc., The 4,000,000
25 Kraus-Anderson Construction 3,000,000

Related Stories

| Sep 7, 2011

Administration, Maintenance and Operations Facility in South Bend achieves LEED Platinum

The facility achieved 52 LEED points, including those for site selection, energy, materials and resources and innovation.

| Sep 6, 2011

Construction on Beijing's tallest building starts next week

The 108 floor mixed-use skyscraper consists of offices, apartments, hotels and shopping malls on the lower floors.

| Aug 31, 2011

Sebastopol, Cailf., invites designers to submit ideas for renewing city center

The goal of The Core Project is to explore how the physical presence of Sebastopol can become a more economically thriving and aesthetically vibrant place, reflecting the naturally beauty of the region and the character of the community. 

| Aug 31, 2011

Wythe Confectionary renovation in Brooklyn completed

Renovation retains architectural heritage while reflecting a modern urban lifestyle.

| Aug 24, 2011

Deadline Extended: 2012 "Best AEC Firms to Work For” Awards

We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. In other words, this awards program will recognize those AEC firms that nurture and develop their most valuable asset—their people.

| Aug 23, 2011

Acoustical design education model

Pass this exam and earn 1.0 AIA/CES Discovery learning units. You must go to www.BDCnetwork.com/EnhancedAcousticalDesign to take this exam.

| Aug 19, 2011

Thought Leader: Boyd R. Zoccola, chair and chief elected officer of BOMA International

Boyd R. Zoccola is Chair and Chief Elected Officer of BOMA International. A BOMA member since 1994, he has served on the Executive, Finance, Investment, and Medical/Healthcare Facilities Committees. An Indiana Real Estate Principal Broker and a board member of the Real Estate Round Table, he is Executive Vice President of Hokanson Companies, Inc., of Indianapolis, and has been involved in the development of $600 million worth of real estate. On a volunteer basis, Zoccola was president of Horizon House and a board member of Girls, Inc. He holds a BA in biology from Indiana University.

| Aug 19, 2011

How and why AEC professionals choose flooring systems

Design and construction professionals who completed our flooring survey had strong opinions about their preferred flooring type. 

| Aug 19, 2011

Underfloor air distribution, how to get the details right

Our experts provide solid advice on the correct way to design and construct underfloor air distribution systems, to yield significant energy savings.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021