![]() |
Project: Medical Education Building, Emory School of Medicine, AtlantaArchitect: The S/L/A/M Collaborative (AE 31)Structural engineer: KSI Structural EngineersMEP engineer: Newcomb & Boyd (E 31)General contractor: The Whiting-Turner Contracting Co. (C 7)Photo: Courtesy The S/L/A/M Collaborative |
University construction spending is 13% higher than a year ago—mostly for residence halls and infrastructure on public campuses—and is expected to slip less than 5% over the next two years. However, the value of starts dropped about 10% in recent months and will not return to the 2007–08 peak for about two years.
Company | Billings ($) | |
Source: 2009 Giants 300 survey. For expanded university design rankings, visit: www.BDCnetwork.com/Giants | ||
1 | Burt Hill | 81,834,000 |
2 | HOK | 75,200,000 |
3 | AECOM Technology Corp. | 63,529,000 |
4 | Cannon Design | 51,084,000 |
5 | Perkins+Will | 48,000,000 |
6 | Gensler | 37,215,000 |
7 | SmithGroup | 36,948,750 |
8 | HDR Architecture | 33,940,000 |
9 | Arup | 33,000,000 |
10 | RMJM | 32,497,392 |
11 | Sasaki Associates | 30,950,000 |
12 | Ellerbe Becket | 28,299,184 |
13 | Dewberry | 28,270,000 |
14 | Jacobs | 27,144,560 |
15 | Affiliated Engineers | 27,132,120 |
16 | EYP Architecture & Engineering | 25,500,000 |
17 | Parsons Brinckerhoff | 25,098,000 |
18 | Stantec | 24,596,000 |
19 | URS Corp. | 21,000,000 |
20 | R.G. Vanderweil Engineers | 20,393,105 |
Company | Value put in place ($) | |
Source: 2009 Giants 300 survey. For expanded university contractor rankings, visit: www.BDCnetwork.com/Giants | ||
1 | Turner | 1,150,600,000 |
2 | Gilbane Building Co. | 703,599,820 |
3 | Whiting-Turner Contracting Co. | 492,258,678 |
4 | Structure Tone | 454,141,500 |
5 | Skanska USA Building | 427,071,221 |
6 | Swinerton Inc. | 299,360,000 |
7 | Webcor Builders | 293,807,692 |
8 | PCL Construction Enterprises | 288,471,629 |
9 | McCarthy Holdings | 277,101,000 |
10 | Flintco Cos., The | 254,428,800 |
11 | JE Dunn Construction Group | 248,391,000 |
12 | Mortenson Construction | 226,008,000 |
13 | Hoffman Construction | 224,000,000 |
14 | Bovis Lend Lease | 212,903,379 |
15 | Clark Group | 210,050,000 |
16 | Austin Industries | 208,199,672 |
17 | Hensel Phelps Construction | 200,220,000 |
18 | C.W. Driver | 177,710,764 |
19 | Hunt Construction Group | 175,000,000 |
20 | DPR Construction | 165,245,490 |
2009 | 2008 | Company | 2008 Billings ($) |
Rank | |||
Source: 2009 Giants 300 survey. For expanded Engineering Firmrankings, visit: www.BDCnetwork.com/Giants | |||
1 | 4 | Syska Hennessy Group | 115,600,000 |
2 | 2 | Fluor Corp. | 114,470,000 |
3 | 3 | KPFF Consulting Engineers | 81,000,000 |
4 | 6 | Affiliated Engineers | 75,367,000 |
5 | 5 | Smith Seckman Reid | 68,260,000 |
6 | 10 | Walter P Moore | 64,572,266 |
7 | 18 | Henderson Engineers | 58,350,590 |
8 | 14 | KJWW Engineering Consultants | 58,265,636 |
9 | 8 | R.G. Vanderweil Engineers | 55,116,500 |
10 | 11 | TLC Engineering for Architecture | 54,685,784 |
11 | — | John A. Martin & Associates | 53,821,300 |
12 | 15 | Clark, Richardson & Biskup Consulting Engineers | 53,688,000 |
13 | 17 | TMAD Taylor & Gaines | 51,030,000 |
14 | 16 | Schirmer Engineering Corp. | 49,483,833 |
15 | 20 | M-E Engineers | 44,700,000 |
16 | 19 | Rolf Jensen & Associates | 44,595,000 |
17 | 23 | Environmental Systems Design | 42,000,000 |
18 | 21 | Weidlinger Associates | 41,000,000 |
19 | 22 | Magnusson Klemencic Associates | 40,000,000 |
20 | 25 | Glumac | 35,500,000 |
21 | 41 | Mazzetti Nash Lipsey Burch | 32,500,000 |
22 | 26 | RDK Engineers | 32,000,000 |
23 | — | Degenkolb Engineers | 31,124,000 |
24 | 33 | KCI Technologies | 28,300,000 |
25 | 12 | X-nth | 27,095,370 |
26 | 27 | Interface Engineering | 26,624,398 |
27 | 9 | Birdsall Services Group | 26,350,000 |
28 | 29 | Coffman Engineers | 26,259,000 |
29 | 28 | Sparling | 26,250,000 |
30 | 30 | M/E Engineering | 25,735,000 |
31 | 44 | Newcomb & Boyd | 25,577,207 |
32 | 32 | H.F. Lenz Co. | 24,000,000 |
33 | 42 | Heapy Engineering | 21,573,000 |
34 | 31 | Henneman Engineering | 21,083,000 |
35 | 37 | GHT Limited | 19,600,000 |
36 | 43 | Rutherford & Chekene | 17,236,000 |
37 | 38 | Joseph R. Loring & Associates | 16,800,000 |
38 | 35 | Lilker Associates Consulting Engineers | 16,000,000 |
39 | 46 | Bridgers & Paxton Consulting Engineers | 15,341,792 |
40 | 36 | Wallace Engineering | 15,070,000 |
41 | — | Dunham Associates | 14,500,000 |
42 | 47 | Peter Basso Associates | 14,300,000 |
43 | 40 | KTA Group | 13,800,000 |
44 | — | Brinjac Engineer | 12,540,000 |
45 | 50 | James Posey Associates | 12,200,000 |
46 | 49 | CB Engineers | 10,410,000 |
47 | 45 | Bala Consulting Engineers | 10,200,000 |
48 | 48 | Wick Fisher White Engineers | 10,000,000 |
49 | 51 | RMH Group, The | 9,848,715 |
50 | — | KLH Engineers | 9,595,932 |
51 | — | Allen & Shariff Corp. | 9,500,000 |
Related Stories
University Buildings | Feb 18, 2022
On-campus performing arts centers and museums can be talent magnets for universities
Cultural facilities are changing the way prospective students and parents view higher education campuses.
Resiliency | Feb 15, 2022
Design strategies for resilient buildings
LEO A DALY's National Director of Engineering Kim Cowman takes a building-level look at resilient design.
Cultural Facilities | Jan 27, 2022
Growth in content providers creates new demand for soundstage facilities
Relativity Architects' Partner Tima Bell discusses how the explosion in content providers has outpaced the availability of TV and film production soundstages in North America and Europe.
Cultural Facilities | Jan 18, 2022
A building in Times Square aspires to be a marketing and arts tool
The 580-ft TSX Broadway will have several LED signs on its exterior, and host an existing 27,000-sf theater that was hoisted 30 ft above street level.
Cultural Facilities | Dec 16, 2021
Museums and other cultural spaces reconsider how to serve their communities
Efforts to raise capital for cultural buildings became necessary during the COVID-19 health crisis.
Giants 400 | Nov 19, 2021
2021 Cultural Facilities Giants: Top architecture, engineering, and construction firms in the U.S. cultural facilities sector
Gensler, AECOM, Buro Happold, and Arup top BD+C's rankings of the nation's largest cultural facilities sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.
Cultural Facilities | Nov 19, 2021
Goettsch Partners completes Lincoln Park Zoo’s Pepper Family Wildlife Center
The project doubles the size of the previous lion habitat.
Cultural Facilities | Nov 17, 2021
Henning Larsen-designed Shaw Auditorium opens at the Hong Kong University of Science and Technology
The project celebrated its grand opening as part of HKUST’s thirtieth anniversary celebration.
Cultural Facilities | Oct 19, 2021
Niagara Falls is getting a bigger Welcome Center
The GWWO Architects-designed building will mostly sit on the site of the center it replaces.
Reconstruction & Renovation | Oct 13, 2021
Restoration of Ramova Theater in Chicago’s Bridgeport Neighborhood begins
The building was originally built in 1929.