A three-level, robotic parking garage will be built underneath an upcoming addition to the ZGF Architects-designed Seattle Cancer Care Alliance (SCCA) clinic in Seattle’s South Lake Union neighborhood. GLY has partnered with WÖHR and subcontractor Harding Steel to build the WÖHR Multiparker 730 system.
The garage, which will solve space challenges and improve the experience for cancer patients and their families, will be the first of its kind for any medical center in the Puget Sound Region and the first of its size and scale on the West Coast. It will be built under a long, narrow 240,000-sf, five-story complex also being constructed by GLY.
See Also: Power moves: The Shed
Patients will be able to drop their vehicle off at a centralized valet who then will take the cars to one of the garage’s robotic lifts and platforms that shift cars vertically and horizontally until they reach a designated spot. The system will be able to park cars closer together than traditional parking spaces, with about 160-180 spots in total. It will also reduce the time and hassle of patients getting in and out of small, ramp-filled garages.
The garage is being designed to be flexible for future use, as it can be disassembled and reshaped for different uses to accommodate needs for future services.
Related Stories
| Sep 7, 2012
Duffy joins Thornton Tomasetti
At Hardesty & Hanover, Duffy partnered with Thornton Tomasetti on a number of projects.
| Sep 7, 2012
Manhattan Construction Co. to build Fairfax office building
Designed by Noritake Associates of Alexandria Virginia, the project is LEED-registered, seeking LEED Silver certification.
| Aug 28, 2012
McCarthy begins construction on transportation center at Bob Hope Airport
Designed to meet LEED silver certification standards, the facility will feature unique, above ground base isolators that will resist a maximum credible earthquake.
| Jul 12, 2012
EE&K and Knutson Construction selected for the Interchange in Minneapolis
Design-build contract for $79.3 million transportation hub will connect transit with culture.
| Jun 14, 2012
Viscardi joins LEO A DALY as VP, corporate director of aviation programs
Viscardi will be responsible for providing the vision and strategy for growing the firm’s aviation practice, identifying and establishing new clients, as well as maintaining existing client relationships.
| Jun 11, 2012
Survey reveals emerging trends in parking
Industry-transforming innovations are changing the way we park.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 31, 2012
5 military construction trends
Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.