flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Goettsch Partners to design three-building Optics Valley Center complex

High-rise Construction

Goettsch Partners to design three-building Optics Valley Center complex

The Chicago-based firm won a design competition to design the complex located in Wuhan, China.


By David Malone, Associate Editor | May 23, 2017

Rendering courtesy of Goettsch Partners.

A new complex coming to Wuhan, China will provide nearly 3.4 million sf of space across three buildings. At the core of the new Optics Valley Center, will stand a 400-meter-tall office tower.

Designed by Chicago-based Goettsch Partners, the tower combines rounded corners with a taper that will work together to reduce wind pressures on the structure. Exterior shades wrap the building and create a rhythmic pattern. According to the architect, the use of color in the façade is meant to reinforce the digital rhythm and provide a subtle reference to the local technology culture.

The tower will be built on two main parcels of land to the southeast of the Wuhan city center. A green belt will run through the heart of the new district and ensure natural light and parkland will be available for all of the structures.

Two new subway lines will provide access to the parcels and a new commuter node will become the epicenter of activity and ensure immediate integration into the broader city.

Greenland Group is developing the project, which hopes to achieve LEED Gold certification. Currently, the development is scheduled to open in 2022.

 

Rendering courtesy of Goettsch Partners.

 

Rendering courtesy of Goettsch Partners.

Related Stories

| Oct 13, 2010

HQ renovations aim for modern look

Gerner Kronick + Valcarcel Architects’ renovations to the Commonwealth Bank of Australia’s New York City headquarters will feature a reworked reception lobby with back-painted glass, silk-screened logos, and a video wall.

| Oct 12, 2010

Guardian Building, Detroit, Mich.

27th Annual Reconstruction Awards—Special Recognition. The relocation and consolidation of hundreds of employees from seven departments of Wayne County, Mich., into the historic Guardian Building in downtown Detroit is a refreshing tale of smart government planning and clever financial management that will benefit taxpayers in the economically distressed region for years to come.

| Oct 8, 2010

Union Bank’S San Diego HQ awarded LEED Gold

Union Bank’s San Diego headquarters building located at 530 B Street has been awarded LEED Gold certification from the Green Building Certification Institute under the standards established by the U.S. Green Building Council.  Gold status was awarded to six buildings across the United States in the most recent certification and Union Bank’s San Diego headquarters building is one of only two in California.

| Sep 21, 2010

New BOMA-Kingsley Report Shows Compression in Utilities and Total Operating Expenses

A new report from the Building Owners and Managers Association (BOMA) International and Kingsley Associates shows that property professionals are trimming building operating expenses to stay competitive in today’s challenging marketplace. The report, which analyzes data from BOMA International’s 2010 Experience Exchange Report® (EER), revealed a $0.09 (1.1 percent) decrease in total operating expenses for U.S. private-sector buildings during 2009.

| Aug 11, 2010

New data shows low construction prices may soon be coming to an end

New federal data released recently shows sharp increases in the prices of key construction materials like diesel, copper and brass mill shapes likely foreshadow future increases in construction costs, the Associated General Contractors of America said. The new November producer price index (PPI) report from the Bureau of Labor Statistics provide the strongest indication yet that construction prices are heading up, the association noted.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021