flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Great Solutions: Business Management

Great Solutions: Business Management


By By Robert Cassidy, Editor-in-Chief; Jay W. Schneider, Senior Editor; Dave Barista, Managing Editor; and Jeff Yoders, Senior Associate Editor | August 11, 2010
This article first appeared in the 200908 issue of BD+C.

The Capitol Cove complex in Providence, R.I. was repositioned, changing
from 96 private condos to Johnson & Wales University student housing.


22. Commercial Properties Repositioned for University USE

Tocci Building Companies is finding success in repositioning commercial properties for university use, and it expects the trend to continue. The firm's Capital Cove project in Providence, R.I., for instance, was originally designed by Elkus Manfredi (with design continued by HDS Architects) to be a mixed-use complex with private, market-rate condominiums. The economy stalled those plans. The economy is also stalling university projects, preventing much-needed student housing from going up. The nation's colleges and universities have the capacity to house only about 25% of students, and since enrollment has a history of rising during a recession, the highered housing crunch could get much worse. Johnson & Wales University saw a solution to its housing shortage by leasing the 96-unit Capital Cove complex, locating students in Providence's historic Capitol District and in close proximity to public transportation, shopping, and cultural attractions. The university also sees the upscale property and its urban setting providing a s

ignificant competitive advantage in attracting new students.

Six previously stalled Value Place hotels are being completed by Englewood Construction’s new distressed property division.


23. Distressed Property Division Targets Stalled Projects

As a result of the slumping economy, there's a glut of distressed, semi-completed properties that started deteriorating soon after construction halted. Seeing an opportunity in helping banks or new investor owners salvage, complete, and reposition these languishing properties, Englewood Construction of Schiller Park, Ill., launched a distressed property division. The GC is licensed in 48 states, which gives clients a single firm and single point of contact to navigate the complexities of many different jurisdictional authorities, damage analysis, and cost estimates endemic to distressed properties. The new division's first contract involves completing six Value Place hotels in four states (Iowa, Louisiana, North Carolina, and Ohio), each one in a different stage of construction. The work involved in completing the Value Place hotels, which are all four-story properties averaging 121 rooms and 42,000 sf, adds approximately 100 construction jobs per building and, once open for business, the hotels will start cont

ributing to their local economies.

24. Bundle Communications and Data Services for Major Savings

We've all seen the TV commercials for AT&T and Comcast selling the cost advantages of bundling phone, cable, and Internet services. Shane Ketterman, network engineer and administrator with ZGF Architects, applied similar logic when searching for ways to cut costs and streamline communications at the 473-employee Portland, Ore., firm.

Ketterman found a partner in PATEC Holding Corp. to develop a customized solution to bundle and transmit all voice, video, Internet, and data services using a dedicated radio frequency line instead of traditional wire distribution. Radio antennas mounted on the roof of each of the firm's five offices transmit and receive voice/data three times faster than before, and at a fraction of the cost. Ketterman's solution will save ZGF $320,000 this year alone.

"Transmitting data via radio waves is much more cost effective and allows greater flexibility for increased bandwidth and additional services as the needs of the business change," says Ketterman. His solution is also much more reliable than traditional delivery methods—the dedicated FCC radio frequency cannot be interrupted or jammed—and it requires le

ss energy to operate.


25. Revit Boot Camp

Patrick Callahan, AIA, LEED AP, a principal with StudioGC, Chicago, leads a group of interns from the University of Illinois at Urbana-Champaign in the firm's "Revit Boot Camp." The month-long workshop provided eight UIUC architecture students with four hours of unpaid BIM training in the morning, followed by four hours of paid studio work in the afternoon. "I thought I knew Revit, but they really showed us how much it could do, how robust it was," said Caroline VanAcker, a junior from Palatine, Ill. Front row, left to right: Kimberly Wiskup, VanAcker, Christiana Symeonides, Fadi Salem, Daniel Martin. Back row: Maria Nikoloski (obscured), Jacob Oostema. Not pictur

ed: Kristina Collet.

26. Keep Your Subcontractors Happy and Save Big Bucks

As part of a companywide commitment to improve relationships with subcontractors, Farmington, Conn.-based KBE Building Corp. (formerly Konover Construction) developed a custom online resource center that provides 24-hour, real-time access to payment status, insurance information, compliance forms, and project details for subcontractors and KBE staff.

"Subs were frustrated with the length of time to get paid, and would frequently call for payment status and other information," says John Patterson, information architect with KBE and developer of the online resource center. He says KBE staff spent hours on the phone daily answering calls, returning calls, and fulfilling requests from subs, costing the company thousands of dollars a month in personnel costs.

After launching the resource center in late 2006, the company saw an immediate 75% reduction in phone calls, in addition to fewer faxes and mailings. Patterson estimates a productivity gain of 25%, saving the company $100,000 annually.

Related Stories

Sustainability | Sep 18, 2024

3 living buildings made by a living practice

Prompting humans to reexamine our relationship to the environment, architecture creates the opportunity for us to physically experience ideas of beauty, performance, and structure through the distinct lens of place.

3D Printing | Sep 17, 2024

Alquist 3D and Walmart complete one of the nation’s largest free-standing, 3D-printed commercial structures

Walmart has completed one of the largest free-standing, 3D-printed commercial structures in the US. Alquist 3D printed the almost 8,000-sf, 20-foot-high addition to a Walmart store in Athens, Tenn. The expansion, which will be used for online pickup and delivery, is the first time Walmart has applied 3D printing technology at this scale. 

Retail Centers | Sep 17, 2024

Thinking outside the big box (store)

For over a decade now, the talk of the mall industry has been largely focused on what developers can do to fill the voids left by a steady number of big box store closures. But what do you do when big box tenants stay put?

Government Buildings | Sep 17, 2024

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.

Codes and Standards | Sep 17, 2024

New California building code encourages, but does not mandate heat pumps

New California homes are more likely to have all-electric appliances starting in 2026 after the state’s energy regulators approved new state building standards. The new building code will encourage installation of heat pumps without actually banning gas heating. 

Mass Timber | Sep 17, 2024

Marina del Rey mixed-use development is L.A.’s largest mass timber project

An office-retail project in Marina del Rey is Los Angeles’ largest mass timber project to date. Encompassing about 3 acres, the 42XX campus consists of three low-rise buildings that seamlessly connect with exterior walkways and stairways. The development provides 151,000 sf of office space and 1,500 sf of retail space.

Education Facilities | Sep 16, 2024

Hot classrooms, playgrounds spur K-12 school districts to go beyond AC for cooling

With hotter weather occurring during the school year, school districts are turning to cooling strategies to complement air conditioning. Reflective playgrounds and roads, cool roofs and window films, shade structures and conversion of asphalt surfaces to a natural state are all being tried in various regions of the country. 

Office Buildings | Sep 16, 2024

Maximizing office square footage through ‘agile planning’

Lauren Elliott, RID, NCIDQ, Director of Interior Design, Design Collaborative, shares tips for a designing with a popular and flexible workspace model: Agile planning.

3D Printing | Sep 13, 2024

Swiss researchers develop robotic additive manufacturing method that uses earth-based materials—and not cement

Researchers at ETH Zurich, a university in Switzerland, have developed a new robotic additive manufacturing method to help make the construction industry more sustainable. Unlike concrete 3D printing, the process does not require cement.

Libraries | Sep 12, 2024

How space supports programming changes at university libraries

GBBN Associate Sarah Kusuma Rubritz, AIA, uses the University of Pittsburgh's Hillman Library to showcase how libraries are transforming to support students’ needs.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021