flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Green Bay Packers to start construction on a business district near Lambeau Field this fall

Sports and Recreational Facilities

Green Bay Packers to start construction on a business district near Lambeau Field this fall

Flush with cash, the NFL team is kicking in about half of the $130 million for the 20-acre project’s first phase.


By John Caulfield, Senior Editor | August 24, 2015
Green Bay Packers to start construction on a business district near Lambeau Field this fall

Image: Titletown District, all renderings courtesy Green Bay Packers (via Green Bay Press Gazette)

This fall, the Green Bay Packers will break ground on Titletown District, a mixed-use development west of the NFL team's home of Lambeau Field. When completed in the fall of 2017, the first phase of Titletown District will include a hotel, a sports medicine center, a restaurant/brewery, and a 10-acre public plaza.

The Milwaukee Business Journal reports that the first phase of this project is expected to cost between $120 million and $130 million, with the Packers contributing $65 million of that total.

For several years, the Wisconsin-based team has been acquiring land in town and demolishing buildings in preparation for starting Titletown District. The first tenant, a 100,000-sf Cabela’s sporting goods outlet the retailer developed with the team, opened in July 2014 and drew 2.8 million visitors in its first 12 months in business.

The Journal reports that this fall the Packers and its Building Team—which includes Sterling Project Development, a New York real estate advisory firm; Rossetti, a Detroit architectural design and planning firm; and Biederman Redevelopment Ventures, a New York design consultant with expertise in public-spaces and streetscapes—will begin installing infrastructure on eight of the project’s 20 acres for initial tenants that will include a five-story, 150-room, four-diamond hotel to be call Lodge Kohler, which the bath and kitchen fixture supplier Kohler Co. will build and operate.

The hotel will not only provide rooms for fans attending Packers’ games, but should also benefit from the 700 events the team conducts annually.  

Other initial tenants will include a 20,000-sf Hinterland restaurant/brewery; and a 30,000-sf sports medicine facility called Bellin Health, which will feature lab, X-ray, and MRI services. The Packers’ team physician Dr. Patrick McKenzie will staff the clinic.

The publicly owned Packers reported $375 million in revenue for fiscal year 2015, up 16%. Team president Mark Murphy said the franchise continues to acquire land with an eye toward further regional economic development that could include residential buildings. 

 

Related Stories

Cultural Facilities | May 13, 2015

MVRDV selected to design High Line-inspired park in Seoul

The garden will be organized as a library of plants, which will make the park easier to navigate. 

Sports and Recreational Facilities | May 5, 2015

Architect scouts investors for underwater tennis court

While off duty, the tennis complex could double as exhibition space.

Mixed-Use | May 5, 2015

Miami ‘innovation district’ will have 6.5 million sf of dense, walkable space

Designing a neighborhood from the ground-up, developers aim to create a dense, walkable district that fulfills what is lacking from Miami’s current auto-dependent layout.

Hotel Facilities | Apr 30, 2015

Atlanta Braves partner with Omni Hotels & Resorts to build hotel near new Suntrust Park

The Omni Atlanta Northwest Hotel will feature 16 floors with 260 guest rooms and suites, rooftop hospitality suites, 12,500 sf of meeting space, a signature restaurant, and an elevated pool deck and bar overlooking the plaza and ballpark. 

Sports and Recreational Facilities | Apr 27, 2015

Qatar unveils Al Rayyan, fifth World Cup stadium

After the World Cup, part of the stadium’s seating will be donated to other countries.

Sports and Recreational Facilities | Apr 24, 2015

HOK unveils renderings and video of new St. Louis NFL stadium

Retractable seating in the corners will allow the stadium to be used for FIFA or Major League Soccer matches, as it expands the field to a FIFA-regulated 120 yards long and 75 yards wide.

Hotel Facilities | Apr 13, 2015

Figure-eight shaped hotel to open around PyeongChang 2018 Winter Olympics Facility

Just three miles away from the Olympic stadiums, the hotel will be a hub of its own.

Sports and Recreational Facilities | Apr 13, 2015

USTA breaks ground on what will be the country’s largest tennis complex

The 63-acre facility is being positioned as a cornerstone for a sports innovation and performance district in Lake Nona, Fla., a 7,000-acre master planned community that continues to expand.

Building Team Awards | Apr 10, 2015

14 projects that push AEC teaming to the limits

From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.

Building Team Awards | Apr 9, 2015

Multifaced fitness center becomes campus landmark

A sloped running track and open-concept design put this Building Team to the test. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021