flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Software an architectural game changer

GREENBUILD 2011: Software an architectural game changer


By By BD+C Staff | October 5, 2011
The software can convert a fully BIM detailed standard Revit design file into an immersive collaborative 3D environment in under

 

SMARTBIM and Vizerra launched their new collaborative software project, VIMTrek, at the Greenbuild Exposition and Conference in Toronto. The VIMTrek software can convert a fully BIM detailed standard Revit design file into an immersive collaborative 3D environment in under five minutes while retaining the BIM data.

The application is able to rapidly convert Autodesk Revit designs into immersive and interactive environments and then share these over the Internet.

The idea came from advanced technologies in the video gaming industry where hyper?fast rendering algorithms are required to produce the immersive and highly detailed environments. The industry standard architectural rendering techniques, which convert design drafts into photorealistic visuals, typically involve a laborious and time?consuming process that can take 15 hours or more to complete and requires a high degree of expertise and computing power. The results of these traditional renderings produce visually stunning but static images, allowing no interactive or, more important, collaborative capabilities because of the large file size.

The software can convert the same Revit design file into an immersive 3D environment in less than five minutes with no extra training or experience required. The new rendering process utilizes unique compression technology that makes the file one?tenth the size of a traditional render and is completely interactive, allowing designers, architects, contractors, and their clients to navigate the environment and experience the building as though they were moving through a video game. BD+C

Related Stories

| Oct 27, 2011

iProspect selects VLK Architects for new office design

Company growth prompted iProspect to make the decision to move to a new space.

| Oct 27, 2011

ASSA Abloy, MAXXESS Systems announce U.S. Aperio integration

Aperio will integrate with MAXXESS's eAXxess  and Efusion Event Management Software packages.

| Oct 26, 2011

Metl-Span selected for re-roof project

School remained in session during the renovation and it was important to minimize the disruption as much as possible.

| Oct 26, 2011

Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.

New store features 1,200 sf fit out at Aventura Mall.

| Oct 25, 2011

HKS Science & Technology practice formed

Specializing in the planning and design of highly technical building types, HKS’s Science & Technology practice offers the broadest range of services available to the academic and biomedical research, biotechnology, pharmaceutical and medical device community, including laboratory programming, planning and design, strategic science planning and laboratory equipment planning.

| Oct 25, 2011

Universal teams up with Earthbound Corp. to provide streamlined commercial framing solutions

The primary market for the Intact Structural Frame is light commercial buildings that are typically designed with concrete masonry walls, steel joists and steel decks.

| Oct 25, 2011

Ritner Steel CEO elected to AISC Board

Freund will begin serving on the AISC board of directors, assisting with the organization's planning and leadership in the steel construction industry.

| Oct 25, 2011

Commitment to green building practices pays off

The study, conducted by the Pacific Northwest National Laboratory, built on a good indication of the potential for increased productivity and performance pilot research completed two years ago, with similarly impressive results.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021