flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Greenhorne & O’Mara signs letter of intent to join Stantec

Greenhorne & O’Mara signs letter of intent to join Stantec

Acquisitions of C3TS and Architecture 2000 also completed.


By Posted by Tim Gregorski, Senior Editor | December 4, 2012

North American design firm Stantec announced plans to acquire Mid-Atlantic-based engineering firm Greenhorne & O’Mara. The multidiscipline, 520-person firm will expand Stantec’s presence and services across the U.S. Atlantic coast, particularly in the transportation sector and with the US federal government. The transaction is expected to close by the end of the year, marking the third firm to join Stantec in the last quarter of 2012.

Headquartered in Laurel, Md., with 16 offices spread throughout the Mid-Atlantic and Southeast regions, Greenhorne & O’Mara specializes in the design of transportation facilities and other infrastructure, including highway and bridge design, traffic engineering, master planning and landscape architecture, structural engineering, U.S. Department of Defense services, and utilities design. Their work also includes particular expertise in water resource projects with U.S. federal agencies, such as flood hazard mitigation and floodplain mapping, National Environmental Policy Act (NEPA) compliance, wetlands delineation and permitting, environmental impact statements, and stormwater management.

Stantec also announced the completion of its acquisition of C3TS, a Florida engineering and design firm with 150 employees. The move established a much stronger presence for Stantec on Florida’s Atlantic coast, bringing total staff in the state to more than 350 in 12 offices. +

Related Stories

| Apr 2, 2012

Gilbane honored for sustainability efforts in Indianapolis

Emmitt J. Bean Federal Center project team for their role in advancing sustainability in the city.

| Apr 2, 2012

Mitsubishi unveils ultra-high-speed elevator for Shanghai skyscraper

The operation of the elevator is scheduled to begin in 2014.

| Apr 2, 2012

Sachse Construction helps complete Salt Lake City’s City Creek Center

Sachse was hired to complete store build-outs at City Creek Center.

| Apr 2, 2012

Culver joins Sasaki as managing director

Culver will work closely with Sasaki firm leaders on issues of strategy, marketing, and business development.

| Apr 2, 2012

EB-5 investment funds new Miramar, Fla. business complex

Riviera Point Holdings breaks ground on $17 million office center.

| Mar 30, 2012

New windows and doors revitalize older buildings

With their improved aesthetics, energy efficiency, and durability, replacement windows and doors can add significant value to a renovation project.

| Mar 30, 2012

18 handy tablet apps for AEC professionals

Check out these helpful apps for everyday design and construction tasks. Our favorite: MagicPlan, which uses GPS to help you measure and draw a floor plan of any room.

| Mar 29, 2012

U.K.’s Manchester Airport tower constructed in nine days

Time-lapse video shows construction workers on the jobsite for 222 continuous hours.

| Mar 29, 2012

Roller shade operating system wins IF Product Design Award

Design experts in the iF jury recognized the engineering invested in the RB 500 Roller Shade, including a metal clutch with a patented construction, a durable zamac housing with polished finish, and a chain drive unit that excels in maximum operating comfort.

| Mar 29, 2012

Lehigh engineering student wins Thornton Tomasetti Foundation Awards Scholarship

The scholarship is awarded annually to a graduate student in structural engineering deemed by the department to have the potential to make an impact in the field professionally.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021