flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Greenhorne & O’Mara signs letter of intent to join Stantec

Greenhorne & O’Mara signs letter of intent to join Stantec

Acquisitions of C3TS and Architecture 2000 also completed.


By Posted by Tim Gregorski, Senior Editor | December 4, 2012

North American design firm Stantec announced plans to acquire Mid-Atlantic-based engineering firm Greenhorne & O’Mara. The multidiscipline, 520-person firm will expand Stantec’s presence and services across the U.S. Atlantic coast, particularly in the transportation sector and with the US federal government. The transaction is expected to close by the end of the year, marking the third firm to join Stantec in the last quarter of 2012.

Headquartered in Laurel, Md., with 16 offices spread throughout the Mid-Atlantic and Southeast regions, Greenhorne & O’Mara specializes in the design of transportation facilities and other infrastructure, including highway and bridge design, traffic engineering, master planning and landscape architecture, structural engineering, U.S. Department of Defense services, and utilities design. Their work also includes particular expertise in water resource projects with U.S. federal agencies, such as flood hazard mitigation and floodplain mapping, National Environmental Policy Act (NEPA) compliance, wetlands delineation and permitting, environmental impact statements, and stormwater management.

Stantec also announced the completion of its acquisition of C3TS, a Florida engineering and design firm with 150 employees. The move established a much stronger presence for Stantec on Florida’s Atlantic coast, bringing total staff in the state to more than 350 in 12 offices. +

Related Stories

| Mar 19, 2012

Smith Carter joins forces with Genivar

Smith Carter has a workforce of some 190 employees and designs complex buildings in challenging environments.

| Mar 19, 2012

HKS Selected for Baylor Medical Center at Waxahachie

Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records. 

| Mar 19, 2012

Mixed-use project redefines Midtown District in Plantation, Fla.

Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC. 

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Mar 16, 2012

Work on Oxnard, Calif. shopping center resumes after a three-year hiatus

Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall. 

| Mar 16, 2012

Stego embarks on HPD Pilot Program

Vapor barrier manufacturer strives to provide better green choices to designers and builders.

| Mar 16, 2012

Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge

Architects in U.S. and abroad offered the chance to showcase their very best work.

| Mar 14, 2012

Hearing to decide fate of unfinished Harmon in Las Vegas under way

The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.

| Mar 14, 2012

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021