Project: Lincoln University, Grim Hall
Location: Lincoln University, PA
Architect: Tevebaugh Associates
Product: FireLite® NT fire-rated glass ceramic with Fireframes® Designer Series doors
For the renovation of Lincoln University’s Grim Hall life sciences building into a state-of-the-art computer facility, Tevebaugh Associates worked to provide students and faculty with improved life safety protection. Updating the 1925-era facility's fire-rated doors was an important component of the project.
Fire-rated doors have advanced significantly in the decades since Grim Hall was first built. Materials like steel and wired fire-rated glass are no longer the only options available for use in doors designated to meet fire and life safety building codes. For example, clear and wireless fire-rated glazing can now defend against fire and provide impact resistance for high traffic areas, without restricting visibility and light transfer.
To provide fire-rated doors with updated functionality in Grim Hall, the design team selected FireLite® NT ceramic glass with Fireframes® Designer Series door frames, both from Technical Glass Products (TGP). FireLite NT is strong, able to withstand the high heat of structural fires for up to three hours and resists shattering when cool water from fire sprinklers or fire hoses strikes the hot glass during a fire. It also meets the CPSC 16CFR 1201 (Category II) safety-glazing classification to provide the highest level of required impact safety. As such, the ceramic glass can withstand a force comparable to the impact of a full-grown, fast-moving adult.
Manufactured using TGP’s ultraHD® Technology, FireLite NT features a clear and nearly colorless surface to better resemble the look of ordinary window glass and visually integrate with the school’s non-fire-rated windows and doors. It also allows the doors to draw daylight into interior spaces, while protecting students and staff from the threat of fire.
Fireframes Designer Series fire-rated doors and frames feature narrow steel profiles that provide a sleek, modern alternative to traditional hollow metal steel frames. The frames can be powder coated to match desired project color schemes, and are available in stainless steel. The modular system is available with ratings up to 90 minutes and can be used with the FireLite family of glass products.
For more information on FireLite ceramic glass products and ultraHD Technology, along with TGP’s other fire-rated glass and framing products, visit fireglass.com.
Technical Glass Products
800.426.0279
800.451.9857 – fax
sales@fireglass.com
fireglass.com
FireLite® NT fire-rated ceramic glass
Related Stories
| Aug 11, 2010
29 Great Solutions for the AEC Industry
AEC firms are hotbeds of invention and innovation to meet client needs in today's highly competitive environment. The editors of Building Design+Construction are pleased to present 29 "Great Solutions" to some of the most complex problems and issues facing Building Teams today. Our solutions cover eight key areas: Design, BIM + IT, Collaboration, Healthcare, Products, Technology, Business Management, and Green Building.
| Aug 11, 2010
Permanent tribute to Daniel Burnham and his Plan of Chicago proposed for Grant Park Museum Campus
The first-place winner of a design competition for a public memorial celebrating Daniel Burnham's impact on Chicago will be announced at a news conference Wednesday, July 8, at 10am CDT. The proposed site for the memorial is on the Museum Campus just north of The Field Museum. The announcement comes after nearly two years of planning by Chicago's architecture, design and urban planning community about how to best honor the legacy of Burnham and the Plan of Chicago he co-wrote with Edward Bennett.
| Aug 11, 2010
Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms
A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Architecture billings index takes turn for the worse
After showing signs of stabilization over the last three months, the Architecture Billings Index (ABI) plunged nearly five points in June. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. The American Institute of Architects (AIA) reported the June ABI rating was 37.7, far lower than the 42.9 the previous month.
| Aug 11, 2010
International Living Building Institute established to advance 'living buildings'
The idea of a Living Building, a high-performance building that produces its own power and cleans and reuses all of its water, is gaining momentum around the world. In an effort to oversee the global development of Living Buildings, the International Living Building Institute (ILBI) has been established.
| Aug 11, 2010
Populous selected to design 'crystalline skin' stadium for 2014 Winter Olympics
Russian officials have selected global architect Populous to design the main stadium for the 2014 Winter Olympic and Paralympic Games in Sochi, Russia. The 40,000-seat stadium will feature a crystalline skin that "engages with its surroundings by day and provides an iconic representation of the color and spectacle of the games when illuminated at night," said Populous senior principal John Barrow.
| Aug 11, 2010
M&A deal volume down 67% in engineering/construction sector: PricewaterhouseCoopers
Global Economic Uncertainty Results in Sluggish Deal Activity in U.S.; China Shows Significant Opportunity for Growth
| Aug 11, 2010
Three Opus Corporation companies file for bankruptcy
Opus Corporation, a developer headquartered in Minnetonka, Minn., filed for bankruptcy in three of its five regional operating companies: Opus East, Opus South, and Opus West. CEO Mark Rauenhorst said sharp declines in commercial real estate values and tight credit markets caused difficulties in refinancing assets and restructuring lending agreements.