flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Growth spurt: A record-breaking 128 buildings of 200 meters or taller were completed in 2016

High-rise Construction

Growth spurt: A record-breaking 128 buildings of 200 meters or taller were completed in 2016

This marks the third consecutive record-breaking year for building completions over 200 meters.


By David Malone, Associate Editor | January 23, 2017

Photo: Jim Trodel, Wikimedia Commons

For the third year in a row, the number of buildings over 200 meters tall that were completed has increased and broken the previous year’s tally. In 2016, 128 buildings 200 meters tall or taller were completed, according to the Council on Tall Buildings and Urban Habitat (CTBUH). The previous record, set in 2015, saw 114 completions of 200 meters or taller. Now, the overall number for buildings at or exceeding 200 meters sits at 1,168, a 441% increase from the 265 that existed in the year 2000.

Of the record-setting 200-meter-tall buildings that were completed in 2016, 18 of them became the tallest in their city, country, or region. Asia had the most 200-meter-tall completions with 107, or a whopping 84% of the 128-building total. 2016 was the fourth year in a row with at least 75% of the 200-meter-plus building completions occurring in Asia. A large portion of these completions were in China, which had the most by a country with a record 84, surpassing its previous high set in 2015 of 68. Among these completions was Guangzhou CTF Finance Centre, which, at 530 meters, stands as the tallest building in Guangzhou, the second-tallest building in China, and the fifth-tallest building in the world.

The Middle East had nine completions of at least 200 meters, matching its total from 2015, and North America had seven completions, a three-building increase from 2015’s four. The United States represented all seven of those North American completions after only completing two in 2015.

Despite the high number of buildings over 200 meters completed, only 10 supertalls (buildings of 300 meters or higher) were finished in 2016. This total was lower than anticipated and is at least in part due to the construction delays that arise when constructing buildings of such immense height. Still, the 10 supertalls completed in 2016 was behind only 2014’s 11 and 2015’s 14.

Looking ahead to 2017, CTBUH is predicting the completion of between 12 and 20 supertalls and between 125 and 150 200-meter-plus buildings overall. The tallest of these projected completions is Ping An Finance Center, which will stand 599 meters and become the second-tallest building in China and the fourth tallest in the world.

For the CTBUH’s full report, click here.

 

Graphic courtesy of CTBUH

Related Stories

High-rise Construction | Dec 20, 2017

Another record year for high-rise construction

More than 140 skyscrapers were completed across the globe this year, including 15 supertall towers.

High-rise Construction | Oct 4, 2017

90-story mixed-use building could become Denver’s first supertall tower

Manhattan-based Greenwich Realty Capital is developing the project.

High-rise Construction | Sep 8, 2017

CTBUH determines fastest elevators and longest runs in the world in new TBIN Study

When it comes to the tallest skyscrapers in the world, the vertical commute in the building becomes just as important as the horizontal commute through the city.

Codes and Standards | Sep 5, 2017

New CTBUH initiatives to investigate link between fire and façades

In wake of Grenfell tragedy, Council forms new workgroup.

Mixed-Use | Aug 30, 2017

A 50-acre waterfront redevelopment gets under way in Tampa

Nine architects, three interior designers, and nine contractors are involved in this $3 billion project.

Codes and Standards | Aug 7, 2017

Council on Tall Buildings and Urban Habitat to create standards to measure floor area

The standards will examine existing codes and regulations to find where they are too broad or contentious.

High-rise Construction | Aug 1, 2017

Construction on the world’s skinniest tower halts due to ballooning costs

The planned 82-story tower has stalled after completing just 20 stories.

Wood | Jun 13, 2017

The first timber high-rise in the U.S. set for construction in Portland

The building’s design, building materials, and commercial tenants are all focused on the key aspect of sustainability.

Office Buildings | May 30, 2017

How tech companies are rethinking the high-rise workplace

Eight fresh ideas for the high-rise of the future, from NBBJ Design Partner Jonathan Ward.

Mixed-Use | May 23, 2017

45-story tower planned for Miami Worldcenter

Pickard Chilton Architects will design the 600,000-sf 110 10th Street.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021