flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Harvey Milk Terminal 1 becomes first airport terminal to achieve LEED v4 Platinum Certification

Standards

Harvey Milk Terminal 1 becomes first airport terminal to achieve LEED v4 Platinum Certification

Airport’s newest terminal uses 60% less energy than comparable facilities
 


By Malcolm Crumbley, Associate Editor | March 3, 2022
Harvey Milk Terminal 1
The SFO became the first airport terminal to receive LEED platinum certification.

The San Francisco International Airport (SFO) announced that Harvey Milk Terminal 1 has become the first airport terminal in the world to earn Platinum certification using the latest standards from the Leadership in Energy and Environmental Design (LEED) program.

The LEED v4 raises the bar for the design, construction, and high-performance structures. SFO earned this certification for Boarding Area B in Harvey Milk Terminal 1. This includes the 25-gate concourse, concession space, and connector to the U.S. Customs Federal Inspection Area.

SFO design
SFO's Harvey Milk Terminal puts an emphasis on design standards.

 

HIGHLIGHTS OF THE HARVEY MILK TERMINAL PROJECT

  • A tote-based Independent Carrier System (ICS) to manage checked baggage, the first in the U.S., which uses 50% less energy and is easier to operate and maintain than previous systems
  • Self-energizing (regenerative) elevators recycle energy, rather than wasting it as heat
  • Go-Slow escalators and moving walkways that reduce speed when not in use to save energy
  • Radiant heating and cooling to complement displacement ventilation to provide energy efficiency, improved indoor air quality and enhanced passenger comfort
  • Dynamic glazed windows that change with the sun’s location, to reduce glare and improve comfort
  • Large windows harnessing daylight to reduce the need for electric lighting
  • Controllable, dimmable, long-life light-emitting diode (LED) fixtures throughout the facility
  • Low-flow, hands-free bathroom fixtures and faucets save water in our drought-prone state
  • Roof-mounted photovoltaic panels, providing renewable power for the facility
  • Highly efficient outdoor air filtration system to remove pollutants and odor to provide healthier indoor environments with minimal efficiency impacts
  • Building materials and furnishings with low-volatile organic compound (VOC) emissions
  • Selection of products, systems and materials with the least environmental or planetary impact based upon Health Product Declarations (HPDs) and Environmental Product Declarations (EPDS)
  • Integrated Building Management System measures energy and water use and adjusts equipment to be more efficient
  • Seamless access to all facilities, including public transit, via the AirTrain electric people mover, which eliminated over 600,000 miles of bus trips annually
  • Recycling and diversion of approximately 95% of construction waste from landfill

 

SFO features
The new and improved features put SFO in its own class.

“We are truly proud to be the first airport in the world to earn LEED v4 Platinum certification,” said Airport Director Ivar C. Satero in the release. “This achievement continues a tradition of leadership in sustainable facilities that includes the first LEED Gold airport terminal in the United States, and the world’s first zero net energy facility at an airport. My thanks go out to the entire project team for continuing to push the envelope for what airports can accomplish to support our environmental goals.”

PROJECT TEAM FOCUSED ON COLLABORATION

A collaboration between HKS, Arup, Woods Bagot, ED2 International, Austin Commercial, Webcor, and Kendall Young Associates, the design takes advantage of every innovation available, beginning with repurposing the existing Boarding Area B to achieve the new 225,000-sf building.

Materials and systems were selected based on having the least environmental impact, such as carbon-sequestering concrete and nontoxic carpet tiles and finishes.

Other features include a sophisticated baggage carousel and photovoltaic panels on the roof, which generate the energy required for operations.

The project management team includes:

  • BAB Design-builder:  Austin Commercial & Webcor Builders Joint Venture with HKS / Woods Bagot / ED2 International / Kendall Young Associates
  • BAB Sustainability Coordinator: Arup
  • BAB Construction Manager: WSP / AGS

Related Stories

Codes and Standards | May 2, 2022

Developer Hines, engineer MKA develop free embodied carbon reduction guide

Real estate management and investment firm Hines has released the Hines Embodied Carbon Reduction Guide. The free guide, produced with Magnusson Klemencic Associates (MKA), is the result of a two-year effort, relying on MKA’s industry-leading knowledge of carbon accounting and involvement in programs such as the Embodied Carbon in Construction Calculator (EC3) Tool.

Codes and Standards | Apr 28, 2022

Architecture firm Perkins&Will to deliver ‘carbon forecasts’ for clients

Global architecture firm Perkins&Will says it will issue its clients a “carbon forecast” for their projects.

Codes and Standards | Apr 27, 2022

White House guidance on Buy American for infrastructure includes waiver process

Recently released guidance on the Buy American provision within the $1.2 trillion Infrastructure Investment and Jobs Act released by the Office of Management and Budget includes a waiver process.

Multifamily Housing | Apr 26, 2022

Investment firm Blackstone makes $13 billion acquisition in student-housing sector

Blackstone Inc., a New York-based investment firm, has agreed to buy student-housing owner American Campus Communities Inc.

Codes and Standards | Apr 25, 2022

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.

Legislation | Apr 21, 2022

NIMBYism in the Sunbelt stymies new apartment development

Population growth in Sunbelt metro areas is driving demand for new apartment development, but resistance is growing against these projects.

Codes and Standards | Apr 18, 2022

Dept. of Energy has RFI on funding cost-effective updated energy codes implementation

The U.S. Department of Energy (DOE) Building Technologies Office (BTO) has issued a request for information regarding funding cost-effective implementation of updated building energy codes.

Legislation | Apr 14, 2022

Defense Dept. building largest 3D-printed structures in Western Hemisphere

The U.S. Department of Defense is constructing three barracks at the Camp Swift Training Center in Bastrop, Texas that will each be the largest 3D-printed structures in the Americas.

Codes and Standards | Apr 13, 2022

LEED multifamily properties fetch higher rents and sales premiums

LEED-certified multifamily properties consistently receive higher rents than non-certified rental complexes, according to a Cushman & Wakefield study of two decades of data on Class A multifamily assets with 50 units or more.

Legislation | Apr 11, 2022

Dept. of Energy releases RFI for K-12 schools energy upgrade program

The U.S. Dept. of Energy (DOE) released a Request for Information (RFI) to help decide how best to spend $500 million from the recently passed federal infrastructure law for K-12 public school energy upgrades.

boombox1
boombox2
native1

More In Category


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021