Copley Wolff Design Group, a landscape architecture and planning firm based in Boston, completed therapy trails for the Spaulding Rehabilitation Hospital in Charlestown Navy Yard. The design of the trails encourages rehabilitation and lets patients practice real-life physical challenges—such as walking on a sloped surface—within a safe, controlled environment.
The trails incorporate staggered stainless steel handrails, increased walk slopes, distance markers, interactive spinning rock elements for upper-body conditioning, varied walking surfaces, and granite stairs.
The therapy trails turn the patient’s recuperation toward the outdoors, bringing them closer to their return to their daily lives. The trails link to Boston’s Harborwalk, a 47-mile pathway lining the harbor.
Also on the Building Team for owner Partners Healthcare: Perkins+Will (architect), Thompson Consultants (MEP), vhb (CE), AKF Group (lighting designer), Haley & Aldrich (geotechnical engineer), and Walsh Brothers (CM).
Related Stories
Great Solutions | Apr 6, 2017
Phone booths for the 21st century
Spotting a phone booth on a public street may not become any less rare, but they may soon become fixtures in the modern office.
Great Solutions | Mar 8, 2017
Pop-out balcony is a breath of fresh air for stuffy hotel rooms and apartments
In less than one minute, Bloomframe transforms from an insulated picture window to an open balcony.
Great Solutions | Feb 3, 2017
Drone-based hospitality concept looks to make nomads of us all
Driftscape could take the resort industry to places no hotel has ventured before.
AEC Tech | Sep 6, 2016
Innovation intervention: How AEC firms are driving growth through R&D programs
AEC firms are taking a page from the tech industry, by infusing a deep commitment to innovation and disruption into their cultural DNA.
Great Solutions | Aug 23, 2016
GBBN designers take on wellness research
In a new research paper, three healthcare specialists present factors that contribute to a psychological state that is receptive to healing.
Great Solutions | Aug 23, 2016
Visual energy model database demystifies net-zero design
Diamond Schmitt Architects’ ecoMetrics tool allows its designers to quickly analyze solutions based on models from 44 LEED-certified projects.
Great Solutions | Aug 23, 2016
Reusable infection control barriers ease hospital renovation
Clark Construction Group pilots the Edge Guard system on the Fair Oaks (Va.) Hospital reconstruction project.
Great Solutions | Aug 23, 2016
Novel construction approach speeds K-12 school projects
The Folia system uses pre-engineered components to deliver school buildings at 20% less cost.
Great Solutions | Aug 23, 2016
Mobile emergency room arrives just in time for Alabama hospital
The MED-1 Mobile Hospital Unit serves as a lower-cost solution during construction of new ED.
Great Solutions | Aug 23, 2016
Durable coffeemaker brings a bit of comfort to job sites
The CoffeeBoxx is lightweight rust proof, dust proof, water resistant, and ultra durable.