flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Herzog & de Meuron completes Switzerland’s largest children’s hospital

Healthcare Facilities

Herzog & de Meuron completes Switzerland’s largest children’s hospital

The new University Children’s Hospital Zurich features 114 rooftop patient rooms designed like wooden cottages with their own roofs.


By Novid Parsi, Contributing Editor  | October 8, 2024
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Photo: © Maris Mezulis, courtesy Herzog & de Meuron

With 114 rooms, the new University Children’s Hospital Zurich is the largest healthcare facility for children and adolescents in Switzerland. Located in a residential neighborhood, the roughly CHF761 million (US$887 million) project comprises two buildings: an acute care hospital and a research and teaching facility.

The acute care hospital functions like a town, with the medical specialties as neighborhoods. On each of the hospital’s three floors, a central main street runs past the green courtyard, providing orientation and allowing sunlight into the building. 

The patient rooms are located on the hospital’s top floor. Each room has been designed like a wooden cottage with its own roof—providing both privacy and a view of the outdoors. The staggered rooms have rooftops at varying inclines, emphasizing the singular identity of each patient. The rooms also offer enough space for parents to spend the night with their children.

The hospital’s abundant daylight, outdoor views, and biophilic design aim to contribute to healing, according to a statement from the design architect, Herzog & de Meuron.

The white, cylindrical teaching and research building features an open, five-story atrium in the center. The research fields are arranged around this central core to encourage collaboration and communication. The building has one 320-seat lecture hall and two 100-seat seminar rooms, as well as study areas. With movable walls, the lecture/seminar rooms, lobby, and café can be reconfigured to form one large event space that can accommodate 670 people. On the floors above, research laboratories and accompanying offices have unobstructed views of the surrounding landscape.

Boulders unearthed during construction have been placed in and around the buildings. The project team also planted over 250 trees. 

On the building team:
Design architect: Herzog & de Meuron
Architect of record: ARGE KISPI (Herzog & de Meuron and Gruner)
Electrical engineer: Amstein + Walthert
Plumbing engineer: Ingenieurbüro Riesen
Structural engineer: ZPF Ingenieure
Building automation and smart building: Jobst Willers Engineering
Construction manager: Gruner

Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Herzog & de Meuron, Foto Michael Schmidt
© Herzog & de Meuron, Foto Michael Schmidt
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Herzog & de Meuron, Foto Michael Schmidt
© Herzog & de Meuron, Foto Michael Schmidt
Herzog & de Meuron completes Switzerland’s largest children’s hospital, courtesy Herzog & de Meuron
© Herzog & de Meuron
Herzog & de Meuron completes Switzerland’s largest children’s hospital, Photo: © Maris Mezulis, courtesy Herzog & de Meuron
Photo: © Maris Mezulis, courtesy Herzog & de Meuron

 

Related Stories

| Apr 18, 2012

Perkins+Will designs new complex for Johns Hopkins Hosptial

The Charlotte R. Bloomberg Children’s Center and the Sheikh Zayed Tower create transformative patient-centric care.

| Apr 17, 2012

Alberici receives 2012 ASA General Contractor of the Year award

Alberici has been honored by the ASA eight times in the award’s nineteen-year history--more than any other general contractor in its class.

| Apr 16, 2012

Freeland promoted to vice president at Heery International

Recently named to Building Design+Construction’s 40 Under 40 Class of 2012.

| Apr 16, 2012

Batson-Cook breaks ground on senior living center in Brunswick, Ga.

Marks the third Benton House project constructed by Batson-Cook.

| Apr 4, 2012

HDS designs Mount Auburn Hospital’s new healthcare center in Waltham, Mass.

HDS Architecture provided design services for all the Mount Auburn Healthcare suites including coordination of HVAC and FP engineering.

| Apr 3, 2012

AIA: Commercial Flooring

Laying the foundation for good design.

| Apr 3, 2012

Suffolk completes phase one of Baystate Medical Center expansion

Construction management firm awarded emergency department project for successful build of $296 million MassMutual Wing and Davis Family Heart and Vascular Center.

| Mar 28, 2012

Holden Cancer Center opens at University of Iowa Hospitals and Clinics

The new cancer clinic provides a significant increase in patient space from the prior facility, which was located in an adjacent building.

| Mar 28, 2012

Tsoi/Kobis & Associates developing master plan for UT Southwestern Medical Center

Firm will spearhead strategies for transforming existing in-patient hospital into state-of-the-art ambulatory care facility.

| Mar 26, 2012

Jones Lang LaSalle completes construction of $536M Parkview Regional Medical Center

Hospital ushers in new era of local access to advanced medical treatments in Northeast Indiana.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021