flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Herzog & de Meuron’s triangle tower stirs controversy in Paris

High-rise Construction

Herzog & de Meuron’s triangle tower stirs controversy in Paris

The 590-foot glass pyramid building will include a 120-room hotel, 754,000 sf of office space, and cultural facilities.


By BD+C Staff | July 13, 2015
Herzog & de Meuron’s triangle tower design stirs controversy in Paris

Residents of the Porte de Versailles neighborhood, in Paris’ 15th arrondissement where the tower is proposed, claim the tower will overshadow them. Renderings courtesy Herzog & de Meuron

More than 40 years have passed since the last skyscraper in Paris, the Tour Montparnasse, was built.

Earlier this month news spread that city officials have approved the construction of a 590-foot tower designed by Swiss practice Herzog & de Meuron, the creative minds behind Beijing’s Bird’s Nest for the 2008 Olympics and London’s Tate Modern museum. The design was originally rejected by the same committee in November 2014, Dezeen reports.

Herzog & de Meuron's scheme for the new addition to Paris’ skyline is a triangular tower with a trapezoid base made of glass. It is proposed for Paris’ 15th arrondissement, in the Porte de Versailles neighborhood. However, according to Dezeen, residents of the neighborhood criticized the building, saying it will overshadow them. Moreover, some politicians alleged that the design is unsustainable.

The project is backed by developer Unibail-Rodamco, and will include a 120-room hotel, 754,000 sf of office space, and cultural facilities, costing $720 million, News.com.au reports.

Pro-development mayor of Paris Anne Hidalgo tweeted that she is “proud and happy that Triangle can be born in Paris.” She estimates 5,000 jobs will be created during construction, and an additional 5,000 jobs once the building is completed, planned for 2018.

 

Related Stories

| May 15, 2012

One World Trade Center goes to new height of sustainability

One of the biggest challenges in developing this concrete mixture was meeting the Port Authority of New York/New Jersey’s strict requirement for the replacement of cement.

| May 14, 2012

SOM to break ground on supertall structure in China

The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| May 1, 2012

Time-lapse video: World Trade Center, New York

One World Trade Center, being built at the site of the fallen twin towers, surpassed the Empire State Building on Monday as the tallest building in New York.

| Apr 27, 2012

China Mobile selects Leo A Daly to design three buildings at its new HQ

LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.

| Apr 25, 2012

McCarthy introduces high school students to a career in construction

High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

| Apr 23, 2012

Innovative engineering behind BIG’s Vancouver Tower

Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.

| Apr 10, 2012

Moriarty & Associates selected as GC for Miami’s BrickellHouse Condo

Construction of the 46-story development is schedule to get underway this summer and be completed in 2014.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021