How long-term O&M combats complex climates

Sponsored Content Energy-Efficient Design

How long-term O&M combats complex climates

With the full O&M package, solar adopters are able to maximize return on investment, optimize system performance and minimize operating costs while controlling long-term costs. 


By Panasonic | March 29, 2016

With COP21 not far behind us and an election on the horizon, climate change and renewable energy continue to be front and center issues on the world stage. Conversely, while electricity rates across the country continue to increase, solar panels have become more affordable and viable than ever. Yet, at a time when green technology is expanding, one question still remains – why aren’t more commercial building professionals investing in clean energy projects?

Battling complex climates

Within the corporate climate, choosing when and how to go solar is a big decision for many companies. Solar installations require committed, experienced partners capable of providing a seamless process from conception to Operations and Maintenance. Unfortunately, more often than not, strong project support at the start diminishes down the line once a project is up and running, where it is needed to ensure a system’s long-term health. To take the first step, building officials and facility managers need assurance that they are working with a qualified company that will stand by their installation for years to come.

Environmentally speaking, a region’s climate can also be a major hurdle. Typically, a solar system’s central inverters are designed to protect against snow. A pioneer in the solar industry since 1975, Panasonic’s rich history of solar project development includes systems constructed in areas prone to heavy snow and aggressive winds. These extreme elements caused precipitation to enter into the central inverters, resulting in serious problems. The challenge here was sourcing and developing an inverter that could flourish in these harsh climates.

O&M in action

When it comes to complex climates, from a corporate or environmental perspective, the value of comprehensive O&M comes into play. With the full O&M package – NOC and maintenance services, operations and asset management, total system protection, expert technical guidance and guarantees – solar adopters are able to maximize return on investment, optimize system performance and minimize operating costs while controlling long-term costs. A full EPC vendor delivering O&M services for highest performance energy generation and ROI, Panasonic provides a sense of comprehensive quality assurance, all backed by an $11 billion balance sheet.

For those projects under the onslaught of severe weather, the Panasonic O&M team went to the source, conducting a root cause analysis with the inverter manufacturer. Working together, Panasonic and the inverter manufacturer identified the necessary design modifications, prototyped an innovative snow shield design, and deployed it as a retrofit

This is just one example of how Panasonic works with its industry-leading Engineering and Development teams of more than 100 employees across the country to ensure project success and keep each installation thriving. When an issue does arise, the Panasonic O&M planning and scheduling team dispatches a technician, optimizing their time onsite to ensure a fast, reliable and cost-effective solution is put into place. With these practices at hand, solar systems are set for success for decades to come.

To learn more about Panasonic O&M services, please visit www.panasonic.com/energysolutions.

Related Stories

| Feb 20, 2012

Comment period for update to USGBC's LEED Green Building Program now open

This third draft of LEED has been refined to address technical stringency and rigor, measurement and performance tools, and an enhanced user experience.

| Feb 17, 2012

Tremco Inc. headquarters achieves LEED Gold certification

Changes were so extensive that the certification is for new construction and not for renovation; officially, the building is LEED-NC.

| Feb 16, 2012

Summit Design + Build begins build-out for Emmi Solutions in Chicago

The new headquarters will total 20,455 sq. ft. and feature a loft-style space with exposed masonry and mechanical systems, 15 foot clear ceilings, two large rooftop skylights and private offices with full glass partition walls.

| Feb 16, 2012

Big-box retailers not just for DIYers

Nearly half of all contractor purchases made from stores like Home Depot and Lowe's.

| Feb 16, 2012

4.8-megawatt solar power system completed at Jersey Gardens Mall

Solar array among the largest rooftop systems in North America.

| Feb 15, 2012

Fourth-generation Ryan to lead Ryan Companies AE team

Ryan leads a team of eight architects, four civil engineers, two landscape architects and two virtual building specialists in their efforts to realize their customer’s vision and needs through Ryan’s integrated project delivery system.

| Feb 15, 2012

Code allowance offers retailers and commercial building owners increased energy savings and reduced construction costs

Specifying air curtains as energy-saving, cost-cutting alternatives to vestibules in 3,000-square-foot buildings and larger has been a recent trend among consulting engineers and architects.

| Feb 14, 2012

SAIC selected for architectural and engineering design services at Lajes Field, Azores

SAIC’s services will include a broad variety of new construction projects and maintenance and repair projects

| Feb 14, 2012

Thornton Tomasetti names Al Hashimi vice president for its Middle East Operations

Al Hashimi is joining the company to help expand Thornton Tomasetti’s business in the region and support clients locally.

| Feb 13, 2012

WHR Architects renovation of Morristown Memorial Hospital Simon Level 5 awarded LEED Gold

Located in the Simon Building, which serves as the main entrance leading into the Morristown Memorial Hospital campus, the project comprises three patient room wings connected by a centralized nursing station and elevator lobby.

boombox1
boombox2
native1

More In Category


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021