flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

How one small architecture firm improved cash flow using ArchiOffice

Sponsored Content

How one small architecture firm improved cash flow using ArchiOffice

Foreman Seeley Fountain Architecture not only managed to survive the Great Recession, it has positioned itself to thrive in the economy’s recovery. 


By BQE Software This is Sponsored Content | July 30, 2014
Photo: BQE Software
Photo: BQE Software

Many architecture firms struggled after the economic downturn hit the design and construction industry hard in 2008. However, Foreman Seeley Fountain Architecture, a small Atlanta firm with 14 employees, managed to survive the Great Recession and is now positioning itself to thrive in the economy’s recovery.

What helped FSF become resilient and get through these tough times was a solution that helped them plug some leaks in their cash flow. By minimizing these leaks, they were able to increase revenue very quickly.

 

Hemorrhaging Money

FSF’s Vice President Jeff Seeley describes his firm as being pretty typical. “We were just like a lot of firms—just spreadsheeting it. We’d file an expense report, then months later, realize we’d forgotten to bill the client for our mileage. It was too late and too embarrassing to go back and ask for it later.” Multiply this by several similar instances and it’s easy to see how FSF’s existing billing system was costing them money. 

Looking back, Seeley realizes there were all kinds of miscellaneous hours for which FSF wasn’t billing, such as additional services, mileage to job sites, and blueprinting. All this billable time was adding up, just not in their bank account.

 

 

Plugging the Leaks

According to Seeley, “All those little things we weren’t billing for? Those added up to thousands of dollars a month. That’s what we started saving when we started using ArchiOffice.” FSF started using ArchiOffice in 2007.

That made all the difference in helping them keep their doors open during hard times. “We have watched other architectural firms require severe staff reductions to survive. We’re still afloat, and I truly believe that’s because we did a better job of identifying those lost reimbursables and learning to time manage our projects better.”

 

Improving Project Management

Because Seeley and his coworkers could see the percentage complete of various project stages with ArchiOffice, they realized how many hours were being spent on certain project phases and started to budget their time better.

“Here’s an example: we were doing a school renovation. We had six weeks. The way we used to do it, I’d just look at it as ‘I’ve got six weeks to do it’ and suddenly, half my fees were eaten up by schematic design,” Seeley laughs. “Now, I pay attention to how many hours have been allotted to complete a task, not what day it is due. Once those hours are up, I start asking where the drawings are, and people don’t spend all their time on one phase.”

FSF’s staff also started doing a better job paying consultants now that ArchiOffice was helping them to plan before the job began, making financial planning clear and easy. They knew where they stood with the budget. “We have a clearer vision of where we’re going to be financially two or three months out, so we do a much better job of allocating our resources. If we know there’s going to be a rise or dip, we can plan accordingly, based on how much work we have ahead of us,” says Seeley.

 

Adapting for the Future

Recently, the firm implemented ArchiOffice’s document management and remote access capabilities. So now, their staff can access project data and documents from anywhere they have internet access–virtually expanding their office’s reach. “We were on a job site recently and someone asked for the specs. No one knew where they were. The contractor didn’t have them—they were probably stuck holding a door open somewhere. So someone pulled out a laptop, accessed ArchiOffice remotely and opened up the specs document for us right away. The amount of time ArchiOffice saves us is invaluable.”

Related Stories

BIM and Information Technology | Dec 21, 2015

Laser scanning and in-shop prefabrication a boon for the WellStar Paulding Hospital

Contractor Brasfield & Gorrie’s use of BIM and prefabrication on the Hiram, Ga., hospital shows how digital tools can lead to savings, safety, and better construction.  

Sponsored | BIM and Information Technology | Dec 17, 2015

How is the Value of VDC for Design Management Translating Outside the US?

Sascha Vesterlund, a VDC Specialist, Design Processer with MT Højgaard, and Nathan Wood, Innovation at DPR Construction, shared their perspectives on VDC

BIM and Information Technology | Dec 3, 2015

New app visualizes cellular and Wi-Fi signals in an area

Using data collected from millions of cell towers and Wi-Fi routers, the app makes the invisible visible.

BIM and Information Technology | Nov 30, 2015

Light-based wireless technology is 100 times faster than Wi-Fi

Li-Fi, which reaches speeds of 224 gigabits per second, is being tested in Estonia.

Sponsored | BIM and Information Technology | Nov 25, 2015

Contractor leverages dynamic site logistic plan as BIM deliverable

I recently sat down with two Architects-Turned-VDC-Process-Managers to discuss the ways in which they are leveraging technology to bring the value of BIM downstream

BIM and Information Technology | Nov 24, 2015

Solving the data conundrum with better tools to capture, share, and analyze information

At a recent Thornton Tomasetti symposium, experts showed how designs and projects can be improved by granular information that’s accessible to more users. 

Modular Building | Nov 19, 2015

AECOM and Project Frog form partnership for building modular data centers

The Rapid Deployment Team will provide solutions for data centers both small (1 MW) and large (50+ MW).

BIM and Information Technology | Nov 18, 2015

AIA: Energy modeling key to reaching carbon neutrality in buildings

Energy modeling allows architects to be more ambitious with energy-saving in their design projects.

Green | Nov 17, 2015

DOE launches new data collaborative to help cities and states boost building efficiency

The SEED Standard will help manage, standardize, share performance data.

Sponsored | BIM and Information Technology | Nov 12, 2015

Is the PDF revolution advancing BIM workflows?

Many project teams who struggle to get everyone up to speed with BIM, find PDFs a useful tool to bridge the gap between the BIM world and the paper world

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021