flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hurricane Harvey damaged fewer apartments in greater Houston than estimated

Multifamily Housing

Hurricane Harvey damaged fewer apartments in greater Houston than estimated

As of Sept. 14, 166 properties reported damage to 8,956 units, about 1.4% of the total supply of apartments, according to ApartmentData.com.


By ApartmentData.com | September 15, 2017
The Houston skyline

Photo: pixabay

ApartmentData.com, a leading marketing and information supplier to the multifamily industry, has been conducting one-on-one interviews with managers at 2,725 apartment properties in Greater Houston to obtain an accurate assessment of the number of units damaged by Hurricane Harvey. (See accompanying chart of properties that were assessed for this report.) 

As of Sept. 14, ApartmentData.com surveyed 1,926, or 70.7% of those 2,725 properties.

Key survey findings:
• 166 properties reported damage to 8,956 units, about 2% of the supply of surveyed properties and 1.4% of the total supply of apartments

• The overall average effective rent per month rose by $12 to $996 from $984 pre-Harvey

• The overall occupancy rate has dropped slightly, to 88.8% from 89.1% pre-Harvey This rate is based on keeping the damaged units in supply. 71,000 units available to rent

• If the damaged units are not included in supply, then the occupancy rate is 90.1 percent. 63,478 units available to rent

• Since Harvey, 6,063 units have been leased

• Prior to Harvey: the inventory of 2,725 properties represented 638,603 units, 70,000 units were available to rent

“As we continue to learn how apartment properties were affected by Harvey, I am surprised by the relatively low number of units damaged,” said Bruce McClenny, President, ApartmentData.com. “The most realistic comparison we can make is to Tropical Storm Allison, when we lost 5% of the supply, which was 20,000 units. Harvey was a much larger storm that created flooding across the entire region and we are only seeing about 2% of the supply affected so far. We still have to assess more properties so that percentage is likely to increase,” he added.

Related Stories

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Oct 17, 2011

Austin's newest urban apartment complex under construction

Complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake views, and is slated to open spring 2013.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

| Oct 6, 2011

GREENBUILD 2011: NEXT Living EcoSuite showcased

  Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.

| Sep 29, 2011

Kohler supports 2011 Solar Decathlon competition teams

Modular Architecture > In a quest to create the ultimate ‘green’ house, 20 collegiate teams compete in Washington D.C. Mall.

| Sep 23, 2011

$5M pledge renewed for Habitat for Humanity

The five-year commitment, which will run through 2015, includes $5 million of donated interior and exterior locks and keys for homes built with Habitat for Humanity homeowner partners and volunteers.

| Sep 23, 2011

Under 40 Leadership Summit

Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.  

| Sep 20, 2011

Jeanne Gang wins MacArthur Fellowship

Jeanne Gang, a 2011 MacArthur Fellowship winner described by the foundation as "an architect challenging the aesthetic and technical possibilities of the art form in a wide range of structures."

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021