flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hydraulic underground boardwalk and gangway system reunites the public with the coastline in Istanbul

Great Solutions

Hydraulic underground boardwalk and gangway system reunites the public with the coastline in Istanbul

The bespoke system is part of a master plan by Dror and Gensler that creates the world’s first underground cruise operation.


By David Malone, Associate Editor | September 14, 2017
The underground gangway rising

Courtesy Dror

For almost two full centuries, a 1.2-kilometer stretch of waterfront in Istanbul, Turkey, restricted access to the public. The area was being used as a cruise terminal, and allowed only maintenance, deliveries, and the 6,000 or so passengers disembarking from each ship to enter the fenced-off space.

A new master plan from Dror and Gensler, currently under construction, will reunite the general public with this stretch of waterfront by moving the terminal operations underground.

The feature that made this below-grade relocation possible is a first-of-its-kind hydraulic boardwalk and gangway system, invented in collaboration with Miami-based BEA Architects. When not in use, the system is completely hidden underground. When a cruise ship docks, the boardwalk hatch opens and becomes a perimeter wall to secure the area. The gangway then rises from its hiding spot underground to meet the ship doors and transport the passengers to the subterranean terminal levels. Once all passengers have disembarked and the ship leaves, the system retreats underground and the space is freed up for public use. The compact design requires a short strip of land that measures just 3.5 meters wide.

This clever solution gives more than 60,000 sm of accessible waterfront space back to the public. Plans call for a pedestrian-only neighborhood that features a mix of shops, restaurants, cultural attractions, and offices.

 

The gangway in its fully underground positionCourtesy Dror.

 

The gangway in the process of risingCourtesy Dror.

 

The gangway up and in positionCourtesy Dror.

Related Stories

Great Solutions | Mar 8, 2017

Pop-out balcony is a breath of fresh air for stuffy hotel rooms and apartments

In less than one minute, Bloomframe transforms from an insulated picture window to an open balcony.

Great Solutions | Feb 3, 2017

Drone-based hospitality concept looks to make nomads of us all

Driftscape could take the resort industry to places no hotel has ventured before.

AEC Tech | Sep 6, 2016

Innovation intervention: How AEC firms are driving growth through R&D programs

AEC firms are taking a page from the tech industry, by infusing a deep commitment to innovation and disruption into their cultural DNA.

Great Solutions | Aug 23, 2016

GBBN designers take on wellness research

In a new research paper, three healthcare specialists present factors that contribute to a psychological state that is receptive to healing.

Great Solutions | Aug 23, 2016

Visual energy model database demystifies net-zero design

Diamond Schmitt Architects’ ecoMetrics tool allows its designers to quickly analyze solutions based on models from 44 LEED-certified projects.

Great Solutions | Aug 23, 2016

Reusable infection control barriers ease hospital renovation

Clark Construction Group pilots the Edge Guard system on the Fair Oaks (Va.) Hospital reconstruction project.

Great Solutions | Aug 23, 2016

Novel construction approach speeds K-12 school projects

The Folia system uses pre-engineered components to deliver school buildings at 20% less cost. 

Great Solutions | Aug 23, 2016

Mobile emergency room arrives just in time for Alabama hospital

The MED-1 Mobile Hospital Unit serves as a lower-cost solution during construction of new ED.

Great Solutions | Aug 23, 2016

Durable coffeemaker brings a bit of comfort to job sites

The CoffeeBoxx is lightweight rust proof, dust proof, water resistant, and ultra durable.

Great Solutions | Aug 23, 2016

Reclaimed wood paneling adds color to retail and hospitality projects

Colorburst panels are available in four stock options—Robin Egg Blue, Viridian Green, Haute Pink, and Cascade White—as well as custom colors.

boombox1
boombox2
native1

More In Category



Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021