flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ingenhoven Architects unveils plans for two Tokyo towers

High-rise Construction

Ingenhoven Architects unveils plans for two Tokyo towers

The Toranomon District will add a business and a residential high-rise, both of which feature green and energy-efficient design.


By Mike Chamernik, Associate Editor | April 21, 2016
Ingenhoven Architects unveils plans for two Tokyo towers

Renderings courtesy Ingenhoven Architects. Click here to enlarge image.

The German firm Ingenhoven Architects designed two towers, a lifestyle and an office high-rise, for Tokyo’s Toranomon District.

The Toranomon Hills Residential Tower and Toranomon Hills Business Tower will be part of a project led by Japanese developer Mori Building. OMA designed a separate tower in the project, the mixed-use Toranomon Hills Station Tower that will connect with a new train station.

Designboom reports that at 220 meters, the 122,000-sm residential building will be Tokyo’s tallest residential structure. The 175,000-sm office tower will stand 185 meters tall.

The towers will abut the existing Toranomon Hills Mori Tower.

Ingenhoven stressed green space. Both buildings feature horizontal ledges that will shade the glass façades. Tenants will be able to use landscaped areas like terraces, decks, and rooftop gardens. All the integrated plants and green space will, according to the firm, reduce air pollutants and enhance the microclimate. 

The towers, which will also utilize rainwater harvesting, photovoltaics, and high-efficiency lighting, are expected to be completed by 2019.

 

Click image to enlarge.

Click image to enlarge.

Related Stories

High-rise Construction | Aug 22, 2016

Tall buildings with a twist: CTBUH ranks the world’s 28 tallest twisting towers

In 2005, the Turning Toroso, designed by Santiago Calatrava, was completed, making it the first twisting skyscraper in the world.

High-rise Construction | Aug 1, 2016

Rising to the occasion: Dubai shows some pictures of proposed 500-step structure

Still in the planning stages, this building would serve tourists and power climbers alike. 

High-rise Construction | Jul 26, 2016

Perkins+Will unveils plans for what will be Atlanta’s second-tallest tower

The 74-story 98 Fourteenth Street will be a mixed-use building with retail space and luxury residential units.

Concrete | Jul 20, 2016

Arup ensures Mexico City concrete skyscraper can withstand seismic activity

Double-V hangers and irregularly spaced gaps allow the structure to bend.  

High-rise Construction | Jul 15, 2016

Zaha Hadid designs geometric flower-shaped tower for sustainable Qatar city

The 38-story building will have a mashrabiya latticed facade with hotel and residential space inside.

High-rise Construction | Jul 14, 2016

New San Francisco mixed-use tower billed as most earthquake-resistant building on the West Coast

A megabrace is a key seismic component at 181 Fremont, with offices, residences, and retail space.

High-rise Construction | Jul 14, 2016

Shigeru Ban designs tower expected to be world’s tallest hybrid timber structure

To lessen the carbon footprint, Terrace House in Vancouver will be made of wood sourced from British Columbia.

High-rise Construction | Jul 12, 2016

Three-tiered, 57-story high-rise development from Arquitectonica coming to Miami

The structure will be the tallest building in the Edgewater District

Office Buildings | Jul 11, 2016

CetraRuddy designs office tower for Manhattan’s Meatpacking district

Plans originally called for a hotel, but the architect and developers adapted their design for commercial use.

Contractors | Jul 4, 2016

A new report links infrastructure investment to commercial real estate expansion

Competitiveness and economic development are at stake for cities, says Transwestern.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021