Work has begun on the 66-acre The Parks at Walter Reed mixed-use development in Washington, D.C. The project is being constructed at the site of the former Walter Reed Army Medical Center and, when completed, will total over 3.1 million sf of new construction and adaptive reuse.
The site was freed up for the project in 2005 when the U.S. Army vacated the base as a result of the Base Realignment and Closure Act and moved to the former National Naval Medical Center in Bethesda, Md.
Over the next 10 to 15 years, The Parks at Walter Reed will undergo multiple phases of construction resulting in the creation of the following:
- Over 2,100 units of rental and for-sale housing, 431 of which will be designated as affordable;
- 230,000-250,000 sf of grocery-anchored retail;
- 185,000 sf of office space;
- A 200-key hotel and conference center;
- 30,000 sf of arts and cultural uses;
- 116,000 sf of ambulatory medical care provided by Howard University Hospital;
- Two language immersion charter schools (one middle-high school and one elementary school);
- Almost 20 acres of open space, parks, and plazas.
The District of Columbia selected Hines, Urban Atlantic, and Triden Development Group as master planner with Weingarten Realty Trust and Toll Brothers also on the development team as component developers.
Initial infrastructure work and the demolition of an existing 2.6 million-sf hospital will begin in 2017.
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.
| Apr 3, 2012
Luxury hotel 'groundscraper' planned in abandoned quarry
Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.