flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Insulated wall system cuts down installation time

Products and Materials

Insulated wall system cuts down installation time

ProGUARD DP is a combined system cuts installation time down to one-third that of traditional wall systems.


By David Malone, Associate Editor | August 30, 2017
The ProGuard concrete Board system being used
The ProGuard concrete Board system being used

The ProGUARD DP Insulated Concrete Board system uses fully engineered panels that offer thermal protection with ship-lapped edges to eliminate thermal breaks and meet continuous insulation requirements.

ProGUARD DP is a combined system that eliminates the separate steps of the drainage plane, insulation, wire lathe, and mortar bed to cut installation time down to one-third that of traditional wall systems. The concrete board and insulation board are laminated together, which results in the use of a quarter-inch concrete board (as opposed to a half-inch) for a more lightweight assembly than in traditional systems.

 

ProGuard used on a building

 

ProGUARD DP can be used with thin brick, thin natural stone, thin porcelain tile, thin manufactured stone, stucco, and synthetic stucco.

Related Stories

| Feb 26, 2012

Milwaukee U-Haul facility receives LEED-CI Silver

The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.

| Feb 22, 2012

Suffolk awarded Boston post office renovation project

Renovation of art deco landmark will add 21,000 square feet of retail and 110 new parking spaces.

| Feb 16, 2012

Big-box retailers not just for DIYers

Nearly half of all contractor purchases made from stores like Home Depot and Lowe's.

| Feb 16, 2012

4.8-megawatt solar power system completed at Jersey Gardens Mall

Solar array among the largest rooftop systems in North America.

| Feb 7, 2012

Kawneer and Traco combine portfolios

Portfolio includes curtain wall systems, windows, entrances and framing systems.

| Jan 31, 2012

AIA CONTINUING EDUCATION: Reroofing primer, in-depth advice from the experts

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Jan 26, 2012

Hendrick Construction completes Osso Restaurant in Charlotte

Designed by François Fossard, Osso's upscale interior includes tapered, twisted decorative columns and an elegant fireplace in the center of the lounge. 

| Jan 26, 2012

American Standard names Gould as president and CEO

Gould succeeds Don Devine, who led the successful turnaround of American Standard Brands.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021