Anchored in the heart of a small rural community, Poettker Construction’s new headquarters stemmed from a 2016 strategic planning session to grow the company’s brand and retain talent.
The company, which over the previous decade had experienced significant expansion, was looking to bring together internal departments that were spread over five buildings, and to add far more collaborative spaces.
The concept from the project’s design architect Oculus Inc. was a historic German bank barn, which are barns built into a bank or hillside. That idea resonated with Poettker Construction, which served as this project’s owner and design-build leader. Oculus Inc. shared its Revit models to illustrate its vision, and created a 3D virtual reality presentation of the new headquarters to show at the groundbreaking ceremony.
The interior design included glassed-enclosed private spaces that allow for intimate collaboration. Image: Joe Dietrich
Fitting the building’s height—which boasts a 37-ft-high interior ceiling—within the context of an adjacent residential neighborhood and the architectural style of the traditional bank barn was creatively addressed by working with the topography of the site.
Energy efficiency is a signature feature of this headquarters. The owner’s goal was to reduce the building’s energy consumption by 75% and its carbon footprint by 65%. To abet that goal, the building’s design called for the addition of a solar farm and LED lighting throughout, as well as fluid application of a vapor barrier onto the building’s envelope.
Another key element was a geothermal heating and cooling system, utilizing the lake on premises as well as wells drilled 300 ft deep.
The headquarters’ exterior façade, with steel and glulam structural features, complements the owner’s diverse construction portfolio, and the materials used allowed for unique framing configurations.
Steel and glulam are the prominent materials used on the building’s façade. Image; Joe Dietrich
The interior design was informed by extensive interviews with management and department heads. The cubicles are tailored to a 21st-century environment with sit-to-stand workstations and open collaboration spaces. Other tech features include an in-house training room that can accommodate seminars, meetings, and learning opportunities for up to 100 people. Connections to facilitate internal and external interactions among departments and clients made working at home easier during the coronavirus pandemic.
The design had to address privacy concerns for departments like accounting and human resources, which are now hosted on the building’s mezzanine level next to Poettker’s executive offices. The mezzanine overlooks the company’s operations department, so the designers installed acoustical ceiling clouds above the accounting department to dampen the sound transfer between levels.
A large lobby and reception area lead to stairs that connect the building’s two work areas. Image: Alise O'Brien
On-site health and wellness amenities include a 24-7 private fitness center for staff, and a 3.5-acre outdoor sanctuary with a lake, waterfall, and landscaping that lead to a walking path.
The headquarters, which opened in October 2019, hosts events to engage and interest people of all ages in the construction industry. Last year, over 200 college and high school students took part in workforce and informational tours of the building.
The headquarters premises include an outdoor sanctuary with a lake, fountains, and walking paths. Image: Joe Dietrich
Submitting firm, Architect and Project manager: Oculus Inc.
Owner/developer and GC/CM: Poettker Construction
Structural Engineer: IMEG Corp.
MEP Engineer: BRiC Partnership
Size: 39,400 sf
Construction time: July 2018 to September 2019
Cost: NA
Delivery method: Design/Build
Photo credit: Alise O’Brien Photography
Related Stories
Building Team Awards | Jun 11, 2019
Learning by doing: Students took an active role in the design of the Bay Area's d.tech high school
Gold Award: D.tech had been occupying temporary spaces that were hardly suited for design thinking.
Building Team Awards | Jun 10, 2019
Technology showcase: PTC's new digs combine lively workspaces with exhibits for its products and platforms
Gold Award: PTC began its fitout even as 121 Seaport was still under construction.
Building Team Awards | Jun 7, 2019
Fast delivery: Construction of McDonald's global headquarters was completed in under seven months
Gold Award: The building has a remarkably diverse array of spaces that include “work neighborhoods.”
Building Team Awards | Jun 7, 2019
Unifying force: A place where a million Tulsans can connect, one by one
Platinum Award: Gathering Place is a 66½-acre public park and playground serving the nearly one million residents of greater Tulsa, Okla.
Building Team Awards | May 24, 2018
Green machine: Janet Durgin Guild and Commons at Sonoma Academy
Honorable Mention: A college prep school gets an uber-green maker space and cooking lab.
Building Team Awards | May 24, 2018
Good neighbor: Wentz Science Center at North Central College
Bronze Award: A conscientious Building Team takes steps to minimize the impact of this large-scale science center project in a historic neighborhood.
Building Team Awards | May 23, 2018
13 projects earn BD+C's 2018 Building Team Awards
Iowa’s game-changing correctional institution and Chicago’s daring hotel and sports development are among 13 projects to earn honors in BD+C’s 2018 Building Team Awards.
Building Team Awards | May 23, 2018
Engineered for extremes: Talan Towers
Bronze Award: Astana’s shimmering mixed-use towers are made to stand up to the region’s harsh, long winters.
Building Team Awards | May 22, 2018
High-tech haven: The Spark at Washington State University
Silver Award: A ‘teaching in the round’ classroom highlights this innovation hub at Washington State University’s Pullman campus.
Building Team Awards | May 22, 2018
LA's game changer: Wilshire Grand Center
Silver Award: This billion-dollar mixed-use tower will alter the Los Angeles skyline in more ways.