A project team that included the designer BOKA Powell and general contractor McCarthy Building Companies recently completed the 55,000-sf Noble Family Performing Arts Center on the Midway campus of Parish Episcopal School in North Dallas.
That same team was involved in another of this school’s expansions, the 24,000-sf Gene E. Phillips Activity Center, which opened for the 2017-2018 school year.
The private Parish Episcopal School celebrates its 50th anniversary this year. Since 2002 it has owned and operated out of what once was ExxonMobil’s Pei Cobb Freed-designed corporate headquarters. The school currently has about 1,200 Pre-K through 12th-grade students and 150 faculty. Its new Performing Arts Center “will play a pivotal role as we celebrate our history and launch a future of limitless possibilities for our students,” said Dave Monaco, Allen Meyer Family Head of School, in a prepared statement.
DESIGN CONTINUITY
The new facility consists of various spaces that include a 515-seat performance hall whose chamber is more than 50 ft tall. A Black Box theater has an audience capacity of 120. The facility features a music hall, rehearsal rooms, and a film screening room. The back-of-house spaces include a scene shop, dressing rooms with a tailoring shop, storage areas, offices, and a storm shelter. A Gallery Space displays works by students and visiting artists.
Parish Episcopal School engaged BOKA Powell—which provided architecture and interior design services—to envision a new building in keeping with the campus’ existing style. During construction, which began in November 2019, McCarthy deployed BIM models, laser scans of the slab, and aerial images, according to the firm’s region president Joe Jourvenal.
The Performing Arts Center connects to existing buildings and incorporates many of the same materials. Pre-cast concrete panels are arranged in a rhythmic pattern to capture the sunlight in a theatrical manner as a reinterpretation of the dramatic north light of the existing Great Hall vault. A grand entrance welcomes guests into a naturally lit lobby.
The completed project has optimized acoustics and a control room with the latest light and sound equipment.
The performing arts center is named in honor of the three children of Natalie and Scott Noble, who invested $3.7 million in the school’s “Limitless” fundraising campaign.
Click here for a short virtual tour of the new building.
Related Stories
| Jun 12, 2014
Austrian university develops 'inflatable' concrete dome method
Constructing a concrete dome is a costly process, but this may change soon. A team from the Vienna University of Technology has developed a method that allows concrete domes to form with the use of air and steel cables instead of expensive, timber supporting structures.
| Jun 9, 2014
Green Building Initiative launches Green Globes for Sustainable Interiors program
The new program focuses exclusively on the sustainable design and construction of interior spaces in nonresidential buildings and can be pursued by both building owners and individual lessees of commercial spaces.
| May 29, 2014
7 cost-effective ways to make U.S. infrastructure more resilient
Moving critical elements to higher ground and designing for longer lifespans are just some of the ways cities and governments can make infrastructure more resilient to natural disasters and climate change, writes Richard Cavallaro, President of Skanska USA Civil.
| May 20, 2014
Kinetic Architecture: New book explores innovations in active façades
The book, co-authored by Arup's Russell Fortmeyer, illustrates the various ways architects, consultants, and engineers approach energy and comfort by manipulating air, water, and light through the layers of passive and active building envelope systems.
| May 19, 2014
What can architects learn from nature’s 3.8 billion years of experience?
In a new report, HOK and Biomimicry 3.8 partnered to study how lessons from the temperate broadleaf forest biome, which houses many of the world’s largest population centers, can inform the design of the built environment.
| May 13, 2014
19 industry groups team to promote resilient planning and building materials
The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.
| May 11, 2014
Final call for entries: 2014 Giants 300 survey
BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.
| May 2, 2014
World's largest outdoor chandelier tops reworked streetscape for Cleveland's PlayhouseSquare
Streetscape project includes monumental gateway portals, LED signage, and a new plaza, fire pit, sidewalk café, and alfresco dining area.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
| Apr 16, 2014
Upgrading windows: repair, refurbish, or retrofit [AIA course]
Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.