A project team that included the designer BOKA Powell and general contractor McCarthy Building Companies recently completed the 55,000-sf Noble Family Performing Arts Center on the Midway campus of Parish Episcopal School in North Dallas.
That same team was involved in another of this school’s expansions, the 24,000-sf Gene E. Phillips Activity Center, which opened for the 2017-2018 school year.
The private Parish Episcopal School celebrates its 50th anniversary this year. Since 2002 it has owned and operated out of what once was ExxonMobil’s Pei Cobb Freed-designed corporate headquarters. The school currently has about 1,200 Pre-K through 12th-grade students and 150 faculty. Its new Performing Arts Center “will play a pivotal role as we celebrate our history and launch a future of limitless possibilities for our students,” said Dave Monaco, Allen Meyer Family Head of School, in a prepared statement.
DESIGN CONTINUITY
The new facility consists of various spaces that include a 515-seat performance hall whose chamber is more than 50 ft tall. A Black Box theater has an audience capacity of 120. The facility features a music hall, rehearsal rooms, and a film screening room. The back-of-house spaces include a scene shop, dressing rooms with a tailoring shop, storage areas, offices, and a storm shelter. A Gallery Space displays works by students and visiting artists.
Parish Episcopal School engaged BOKA Powell—which provided architecture and interior design services—to envision a new building in keeping with the campus’ existing style. During construction, which began in November 2019, McCarthy deployed BIM models, laser scans of the slab, and aerial images, according to the firm’s region president Joe Jourvenal.
The Performing Arts Center connects to existing buildings and incorporates many of the same materials. Pre-cast concrete panels are arranged in a rhythmic pattern to capture the sunlight in a theatrical manner as a reinterpretation of the dramatic north light of the existing Great Hall vault. A grand entrance welcomes guests into a naturally lit lobby.
The completed project has optimized acoustics and a control room with the latest light and sound equipment.
The performing arts center is named in honor of the three children of Natalie and Scott Noble, who invested $3.7 million in the school’s “Limitless” fundraising campaign.
Click here for a short virtual tour of the new building.
Related Stories
| Sep 19, 2013
What we can learn from the world’s greenest buildings
Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.
| Sep 19, 2013
6 emerging energy-management glazing technologies
Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level.
| Sep 19, 2013
Roof renovation tips: Making the choice between overlayment and tear-off
When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.
| Sep 11, 2013
BUILDINGChicago eShow Daily – Day 3 coverage
Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 10, 2013
BUILDINGChicago eShow Daily – Day 2 coverage
The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.
| Aug 26, 2013
What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets
BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets.
| Aug 22, 2013
Energy-efficient glazing technology [AIA Course]
This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Jul 29, 2013
2013 Giants 300 Report
The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.
| Jul 22, 2013
Cultural Facility Report [2013 Giants 300 Report]
Building Design+Construction's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2013 Giants 300 Report.