flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Jerusalem to get a high-rise pyramid by Daniel Libeskind

High-rise Construction

Jerusalem to get a high-rise pyramid by Daniel Libeskind

Once completed, the tower will be the city’s second tallest.


By Adilla Menayang, Assistant Digital Editor | July 29, 2015
Jerusalem, Israel, Daniel Libeskind, Mahane Yehuda Market, The Shuk

A 3,251-sf plaza at the tower’s base will provide a public gathering spot. Renderings courtesy Studio Libeskind

Are pyramids making a comeback? The city of Paris recently approved a triangle-shaped building designed by Swiss practice Herzog & de Meuron that stirred controversy from residents. Now, the city of Jerusalem gave a pyramid-shaped building by Daniel Libeskind the go-ahead, Dezeen reports.

The mixed-use, 26-story building will have a height of around 345 feet, just 53 feet shorter than the city’s tallest, Holyland Tower 1. It will have space for 200 luxury apartments, a boutique hotel, a rooftop restaurant, and an observatory.

The main materials used for the façade will be Jerusalem stone and glass.

Planned to be centrally located, next to the Mahane Yehuda market, Libeskind said he hopes the tower can represent mediation between ancient traditions and myths with the modern and new.

"The design complements the context and gives the neighbourhood a vibrant public space in the heart of the ancient city," he says.

A 3,251-sf plaza at the tower’s base will provide a public gathering spot. "With its many amenities and public spaces, the pyramid is set to become an integral part of the neighbourhood, servicing citizens and tourists alike," Studio Libeskind told Dezeen.

 

Related Stories

High-rise Construction | Sep 18, 2019

Central Park Tower tops out in New York City

The building will be the tallest residential skyscraper in the world.

AEC Innovators | Aug 27, 2019

7 AEC industry disruptors and their groundbreaking achievements

From building prefab factories in the sky to incubating the next generation of AEC tech startups, our 2019 class of AEC Innovators demonstrates that the industry is poised for a shakeup. Meet BD+C’s 2019 AEC Innovators.

Museums | Jul 29, 2019

A new museum debuts inside the Empire State Building

A $165 million, 10,000-sf museum opened on the second floor of the Empire State Building in New York City, completing the second of a four-phase “reimagining” of that building’s observatory experience, which draws four million visitors annually.

High-rise Construction | Jul 25, 2019

Could this 500 foot, Bjarke Ingels-designed observation tower rise in San Diego?

The tower would be part of the $2.4 billion Seaport San Diego project.

Building Tech | Jun 26, 2019

Modular construction can deliver projects 50% faster

Modular construction can deliver projects 20% to 50% faster than traditional methods and drastically reshape how buildings are delivered, according to a new report from McKinsey & Co.

High-rise Construction | Apr 11, 2019

Top new skyscrapers for 2019: Salesforce Tower named best worldwide

The San Francisco tower was recognized for its innovations in seismic engineering and a design that "gives back" to the community. 

High-rise Construction | Apr 10, 2019

*Updated* A Tulip is ready to bloom in London

Designed by Foster + Partners, the Tulip will rise 1,001 feet and be a new cultural and tourist attraction.

High-rise Construction | Mar 4, 2019

Goettsch Partners' tallest tower ever tops out in China

The tower will become the tallest in Nanning, China upon completion.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021