Katerra, the Menlo Park. Calif.-based technology company that specializes in prefabricated construction services, is expanding that portfolio through its acquisition of UEB Builders and Fortune-Johnson General Contractors (F-J).
UEB is a GC that specializes in commercial and residential projects such as multifamily, student housing, mixed use, and institutional. UEB can now tap into Katerra’s sales network that includes 11 offices in the U.S. (three of which are in Arizona) and one in Guadalajara, Mexico.
“Katerra reflects what we both believe in,” says Michael Hurst, a Principal at UEB Builders. “A shared desire to find a better way to build for our partners and their communities.” Prior to this merger, UEB had worked with Katerra on a number of projects, including Union South Bay, a 357-unit midrise apartment development under-construction in Carson, Calif.
F-J, founded in 1991, focuses primarily on multifamily construction, but also engages a variety of building types including high-density mixed-use communities, garden-style apartments, senior living, and student housing.
F-J was awarded the 2018 Multi-Family Builder of the Year by the National Association of Home Builders.
Katerra did not disclose the terms of these acquisitions, nor provide specifics about how the businesses would be integrated into its operations, expect to note that through these partnerships, Katerra would gain further construction expertise that will allow the company to expand its geographical footprint across the United States.
“Both companies share Katerra’s commitment to delivering increased value to customers by embracing technology and innovative methods,” says Michael Marks, CEO and co-founder of Katerra.
And given that Katerra owns four architecture firms, it can now present itself to clients as a full-service provider of manufacturing, design, engineering, and construction.
Katerra is focused on speed-to-market construction through such tools as digital technology, offsite manufacturing, and fully integrated building teams. For example, a garden-style multifamily building might take 140 days to complete via conventional construction. In Las Vegas, Katerra initiated K90, an R&D project where it built a 24-unit garden apartment in 90 days, from framing to delivery, leaning heavily on modular and prefabrication for such repetitive areas as bathrooms.
To see a video about K90, click here.
UEB and F-J fall under the oversight of Paal Kibsgaard, who last month joined Katerra as its COO, a new position for the company. Kibsgaard had been chairman and CEO of Schlumberger Ltd., an oilfield services company. He has also served on Katerra’s board for three year.
Kibsgaard is now responsible for Katerra’s U.S. operations, including architecture, engineering, manufacturing, and construction. Kibsgaard is also responsible for international expansion, and the development of new construction technologies.
Related Stories
| Apr 16, 2012
Drake joins EYP as science and technology project executive
Drake’s more than 30 years of diversified design and project delivery experience spans a broad range of complex building types.
| Apr 16, 2012
$80 million in export financing for solar project in India
The project, “Rajasthan Sun Technique Energy Private Limited,” is a subsidiary of Reliance Power and is being co-financed by the Asian Development Bank and FMO, the Dutch development bank.
| Apr 13, 2012
Arcadis merges with Davis Langon & Seah
Merger will help company expand business in Asia.
| Apr 13, 2012
Goettsch Partners designs new music building for Northwestern
The showcase facility is the recital hall, an intimate, two-level space with undulating walls of wood that provide optimal acoustics and lead to the stage, as well as a 50-foot-high wall of cable-supported, double-skin glass
| Apr 13, 2012
Best Commercial Modular Buildings Recognized
Judges scored building entries on a number of criteria including architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete, while marketing pieces were judged on strategy, implementation, and quantifiable results. Read More
| Apr 12, 2012
Solar PV carport, electrical charging stations unveiled in California
Project contractor Oltman Construction noted that the carport provides shaded area for 940 car stalls and generates 2 MW DC of electric power.
| Apr 11, 2012
Shawmut appoints Tripp as business development director
Tripp joined Shawmut in 1998 and previously held the positions of assistant superintendent, superintendent, and national construction manager.
| Apr 11, 2012
Corgan & SOM awarded contract to design SSA National Support Center
The new SSA campus is expected to meet all Federal energy and water conservation goals while achieving LEED Gold Certification from the United States Green Building Council.
| Apr 11, 2012
C.W. Driver completes Rec Center on CSUN campus
The state-of-the-art fitness center supports university’s goal to encourage student recruitment and retention.