Kolbe expanded its library of 2-D models and 3-D building information modeling (BIM) tools to include Ultra Series Beveled Direct Set windows. Complementing contemporary design projects, these durable, aluminum clad windows are glazed to the interior and direct set in the heavy-duty extruded aluminum frame.
The profile is integral to the frame, providing detail and strength. The new Revit and Google SketchUp models for Ultra Series Beveled Direct Set windows are located in Kolbe's online Architect Library. As part of Kolbe's growing collection of more than 1,000 window and door models, these new models can link with external data sources to instantly compile quantity takeoffs for residential and commercial building projects. These easy-to-use models allow users to customize the width, height, exterior trim, casement profiles, and other features.
A wide range of wood species is available including those certified by the Forest Stewardship Council (FSC). FSC-certified options can be coupled with energy efficient glass choices. Kolbe's Ultra Series Beveled Direct Set windows include LoE-270 insulating glass with argon gas. Due to the glass unit being set directly into the frame without a sash, these windows maximize the view and daylight. Plus, the detailed sticking allows for Kolbe's performance divided lite (PDL) options, grilles-in-the-airspace, or interior wood removable grilles.
The exterior aluminum clad frames contain recycled content, further supporting environmentally sensitive projects such as those pursuing recognition by Energy Star, Green Building Initiative's Green Globes, and the U.S. Green Building Council's LEED Rating System. The frames may be in a broad palette of distinctive colors aid in achieving eye-catching designs. Learn more about Kolbe's Direct Set window products and models at www.kolbe-kolbe.com. BD+C
Related Stories
| Sep 13, 2010
World's busiest land port also to be its greenest
A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day.
| Sep 13, 2010
Triple-LEED for Engineering Firm's HQ
With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.
| Sep 13, 2010
Stadium Scores Big with Cowboys' Fans
Jerry Jones, controversial billionaire owner of the Dallas Cowboys, wanted the team's new stadium in Arlington, Texas, to really amp up the fan experience. The organization spent $1.2 billion building a massive three-million-sf arena that seats 80,000 (with room for another 20,000) and has more than 300 private suites, some at field level-a first for an NFL stadium.
| Sep 13, 2010
'A Model for the Entire Industry'
How a university and its Building Team forged a relationship with 'the toughest building authority in the country' to bring a replacement hospital in early and under budget.
| Sep 13, 2010
Committed to the Core
How a forward-looking city government, a growth-minded university, a developer with vision, and a determined Building Team are breathing life into downtown Phoenix.
| Sep 13, 2010
Conquering a Mountain of Construction Challenges
Brutal winter weather, shortages of materials, escalating costs, occasional visits from the local bear population-all these were joys this Building Team experienced working a new resort high up in the Sierra Nevada.
| Sep 13, 2010
Data Centers Keeping Energy, Security in Check
Power consumption for data centers doubled from 2000 and 2006, and it is anticipated to double again by 2011, making these mission-critical facilities the nation's largest commercial user of electric power. With major technology companies investing heavily in new data centers, it's no wonder Building Teams see these mission-critical facilities as a golden opportunity, and why they are working hard to keep energy costs at data centers in check.
| Sep 13, 2010
3D Prototyping Goes Low-cost
Today’s less costly 3D color printers are attracting the attention of AEC firms looking to rapidly prototype designs and communicate design intent to clients.
| Aug 11, 2010
Cubellis principals reorganize as CI design
Former principals of Cubellis Inc. have formed ci design "with a stellar group of projects in the United States and internationally," states John Larsen who, with Richard Rankin and Christopher Ladd, is leading the architecture and planning firm.
| Aug 11, 2010
Leo A Daly changes name of STH, completes acquisition
LEO A DALY has changed the name of STH Architectural Group to the name of its parent company, Leo A Daly. STH was acquired in February 2009 as a strategic move to accelerate growth in its core business sectors and to strengthen the firm's presence in the Florida market.