flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KPF breaks ground on West Lake 66 mixed-use development in Hangzhou

Mixed-Use

KPF breaks ground on West Lake 66 mixed-use development in Hangzhou

The project hopes to reinvigorate the city’s deteriorated surrounding blocks.


By David Malone, Associate Editor | October 1, 2019
West Lake 66 mixed-use development

Plomp for KPF.

Kohn Pedersen Fox Associates (KPF) has officially broken ground on West Lake 66 in Hangzhou, China. The project will form a new elevated green pedestrian link between West Lake and the Grand Canal, two of Hangzhou’s essential landmarks.

The 194,000-sm project includes five office towers with space suited to technology startups and young professionals, a boutique hotel, public parks, and an active, mixed-use podium. KPF parametrically linked shadow impacts, visibility from streets, unobstructed views, maximized daylight, and other key factors in an algorithm that organized optimal massing along the greenway to determine the position of the buildings and the overall site organization.

 

West Lake 66 in hangzhouPlomp for KPF.

See Also: A series of glass ‘igloos’ create the world’s northernmost hotel

 

The buildings’ facades optimize daylight while the overall project was designed with a modular, fluid porosity that reflects the material heritage of the city and its craftspeople using local materials like terracotta, stone, and wood.

 

West Lake 66 green spacePlomp for KPF.

 

The podium is designed in sinuous bands of rectangular cells, each one responding to the program within, that tie the site together. The cells can be updated over the lifespan of the building. The podium also stacks a mix of uses to form a layered program that ensures future flexibility. Office space opens to a green roof that spans the length of the podium to create a public sky park.

 

West lake 66 from KPFPlomp for KPF.

 

West Lake 66 in winterPlomp for KPF.

 

West Lake 66 elevated greenwayPlomp for KPF.

 

West Lake 66 site planJim Keen for KPF.

Tags

Related Stories

Mixed-Use | Jan 26, 2018

Eager Park opens as health and wellness centerpiece of future mixed-use master plan

The 6-acre park was designed to showcase East Baltimore’s commitment to wellness and sustainability.

Sports and Recreational Facilities | Jan 25, 2018

Virginia Beach: A surf town with a wave problem no more

A world-class surf park will highlight Virginia Beach’s new live-work-play development.

Mixed-Use | Jan 16, 2018

Mixed-use development under construction in Detroit’s central business district

The development is being built on the former site of the Statler Hotel.

Mixed-Use | Jan 5, 2018

USC Village is the largest development in the history of the University of Southern California

USC Village comprises six buildings and 1.25 million sf.

Mixed-Use | Jan 3, 2018

A Houston luxury apartment complex has its own co-working space

The new community is located in the economic and population center of Houston.

Mixed-Use | Jan 2, 2018

Food incubator will support entrepreneurs on Chicago’s West Side

Designed by Wight & Company, the 67,000-sf food incubator development in Chicago’s East Garfield Park neighborhood will also serve as the new headquarters for the nonprofit Accion Chicago.

Mixed-Use | Dec 12, 2017

A new live/work neighborhood is about to get under way in Omaha, Neb.

Walkability and recreation will be key features of West Farm.

Mixed-Use | Dec 12, 2017

Construction begins on Phase I of $240 million mixed-use development in Boston

Fenway Center will span 4.5 acres between Brookline, Beacon Street, David Ortiz Way, and the Massachusetts Turnpike.

Mixed-Use | Nov 17, 2017

Riverton will be the largest mixed-use project in New Jersey history

The 418-acre waterfront development will sit on the Raritan River.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021