KTGY Architecture and Planning has unveiled the designs for the Main Street mixed-use portion of Downtown Superior. The project will create a walkable 12-acre mixed-use location incorporating residential, commercial, civic, retail, and restaurants.
The mixed-use community has been inspired by the area’s coal mining history and uses a blend of materials including brick and black metal. The designs for the 10 residential, four commercial, and four mixed-use buildings will help establish a sense of place along the new Main Street between Marshall Road and Superior Drive. In total, the buildings will comprise 382 residential units and over 70,000 sf of commercial, retail, and restaurant space.
On the north side of Main Street, a five-story apartment building with structured parking sits adjacent to retail spaces. “The large ‘wrap’ building, which features 76 residential units and commercial retail, will be topped by a 5th story resident clubhouse and pool deck which will have panoramic views of the Flat Irons and the entire Front Range,” said Terry Willis, AIA, LEED AP, KTGY Principal in a release. “The above-grade parking garage in the wrap building provides ultimate convenience both for residents and patrons of the civic functions, retail and restaurants.”
See Also: Building sensors: A digital crystal ball
A landscaped paseo runs as a central spine between the apartment building and the park-front restaurant, ending on the northern end of the paseo and connecting residential units to the retail plaza. The central plaza will serve as the public town square and open to Main Street, engaging the first-floor commercial uses along its sides. The central plaza is designed to host concerts, markets, and community events.
A stand-alone retail building will anchor the plaza at the corner of Superior and Main Street. On the south side of Main Street, two stories of residential sit atop a first-floor commercial space.
Construction will begin in the second quarter of 2020 with the first phase of apartments and retail slated for completion by the end of the summer in 2021. The final phase is anticipated to complete in the second half of 2022.
The overall development plans for Downtown Superior include public sports fields as part of a new 46-acre public park system, offices, hotels, entertainment, civic additional residential, and medical facilities.
Related Stories
| Aug 11, 2010
Accor North America launches green hotel pilot program
Accor North America, a division of Accor Hospitality, has announced that it will pilot the Green Key Eco-Rating Program within its portfolio in the United States in 2010. Green Key is the first program of its kind to rank, certify and inspect hotels and resorts based on their commitment to sustainable "green" practices; the Accor North America pilot will involve 20 properties.
| Aug 11, 2010
CTBUH changes height criteria; Burj Dubai height increases, others decrease
The Council on Tall Buildings and Urban Habitat (CTBUH)—the international body that arbitrates on tall building height and determines the title of “The World’s Tallest Building”—has announced a change to its height criteria, as a reflection of recent developments with several super-tall buildings.
| Aug 11, 2010
Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms
A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
See what $3,000 a month will get you at Chicago’s Aqua Tower
Magellan Development Group has opened three display models for the rental portion of Chicago’s highly anticipated Aqua Tower, designed by Jeanne Gang. Lease rates range from $1,498 for a studio to $3,111 for a two-bedroom unit with lake views.
| Aug 11, 2010
Architecture Billings Index flat in May, according to AIA
After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.
| Aug 11, 2010
Construction employment declined in 333 of 352 metro areas in June
Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America. The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.
| Aug 11, 2010
Casino Queen breaks ground on $2.15 million entertainment venue
The Casino Queen in East St. Louis, Ill., is raising the stakes in its bid to capture a larger share of the local gaming market with the start of construction on a new $2.15 million sports bar and entertainment venue that will enhance the overall experience for guests.
| Aug 11, 2010
Outdated office tower becomes Nashville’s newest boutique hotel
A 1960s office tower in Nashville, Tenn., has been converted into a 248-room, four-star boutique hotel. Designed by Earl Swensson Associates, with PowerStrip Studio as interior designer, the newly converted Hutton Hotel features 54 suites, two penthouse apartments, 13,600 sf of meeting space, and seven “cardio” rooms.