flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lack of standards hampers development of exoskeleton industry

AEC Tech

Lack of standards hampers development of exoskeleton industry

Guidelines, common terminology, and testing methodology are needed, says expert. 


By By Peter Fabris, Contributing Editor | July 15, 2019
Lack of standards hampers development of exoskeleton industry

Photo: SuitX

   

The exoskeleton industry is being held back by a lack of standards, according to Forbes contributor Borislav Marinov.

A lack of guidelines, common terminology, and testing methodology leave it to users to develop their own best practices and evaluation procedures. Exoskeleton technology can augment construction workers physical ability and potentially reduce injuries.

The dearth of standards prevents the gathering of test results, which, in turn, has hindered the development of industrial exoskeleton applications, Marinov wrote. Although organizations such as ASTM International and the International Organization for Standards have released some standards, they fall short of the comprehensive rules that are needed to give users a deep understanding of exoskeleton use. ​

Even so, Marinov points out that the market for exoskeletons for industrial use has gone from next to nothing to nearly 10,000 commercially purchased units over the past 10 years.

Related Stories

AEC Tech | Oct 30, 2019

Robot masons work with humans on a $52 million housing project in Illinois

The machines address trade labor shortages, as well as worker wellbeing and safety.

AEC Tech | Oct 29, 2019

Bluebeam launches Revu 2019, with accelerated rendering and enhanced measurement functionality

The latest version of the company's flagship tool focuses on accuracy, speed, standardization.

AEC Tech | Sep 27, 2019

Dual, often incompatible, management systems add work and cost to projects

A new survey finds that contractors and owners differ about the urgency of getting to single, seamless platforms.

3D Printing | Sep 17, 2019

Additive manufacturing goes mainstream in the industrial sector

More manufacturers now include this production process in their factories.

Multifamily Housing | Sep 12, 2019

Meet the masters of offsite construction

Prescient combines 5D software, clever engineering, and advanced robotics to create prefabricated assemblies for apartment buildings and student housing.

AEC Innovators | Aug 27, 2019

7 AEC industry disruptors and their groundbreaking achievements

From building prefab factories in the sky to incubating the next generation of AEC tech startups, our 2019 class of AEC Innovators demonstrates that the industry is poised for a shakeup. Meet BD+C’s 2019 AEC Innovators.

AEC Tech | Aug 25, 2019

Deluxe parking: A condo building in Philadelphia offers its owners a completely automated parking service

This is the first “palletless” system that Westfalia Technologies has installed.

Codes and Standards | Aug 22, 2019

5G expected to give a boost to construction technology

Virtual reality, Internet of Things, robotics, and drones will all benefit from enhanced data flows.

AEC Innovators | Aug 15, 2019

Oracle’s replica of a construction jobsite creates an immersive environment for AEC professionals

The Oracle Construction and Engineering Innovation Lab allows visitors to walk through five different stages of construction work, to test new AEC technologies and training techniques.

AEC Tech | Aug 14, 2019

ConTech VC discloses details about latest fund

Brick & Mortar Ventures has struck 16 deals in past 20 months.

boombox1
boombox2
native1

More In Category


3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021