flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lack of standards hampers development of exoskeleton industry

AEC Tech

Lack of standards hampers development of exoskeleton industry

Guidelines, common terminology, and testing methodology are needed, says expert. 


By By Peter Fabris, Contributing Editor | July 15, 2019
Lack of standards hampers development of exoskeleton industry

Photo: SuitX

   

The exoskeleton industry is being held back by a lack of standards, according to Forbes contributor Borislav Marinov.

A lack of guidelines, common terminology, and testing methodology leave it to users to develop their own best practices and evaluation procedures. Exoskeleton technology can augment construction workers physical ability and potentially reduce injuries.

The dearth of standards prevents the gathering of test results, which, in turn, has hindered the development of industrial exoskeleton applications, Marinov wrote. Although organizations such as ASTM International and the International Organization for Standards have released some standards, they fall short of the comprehensive rules that are needed to give users a deep understanding of exoskeleton use. ​

Even so, Marinov points out that the market for exoskeletons for industrial use has gone from next to nothing to nearly 10,000 commercially purchased units over the past 10 years.

Related Stories

AEC Tech | Feb 28, 2018

Nine tips to bridge the cybernetic design gap

Unlike other technologies we have seen, augmented and virtual reality are looking to have staying power in a truly disruptive way.

AEC Tech | Jan 29, 2018

thyssenkrupp tests self-driving robot for ‘last mile’ delivery of elevator parts

“With driverless delivery robots, we could fill a gap and get spare parts from our warehouses to the jobsite faster,” said thyssenkrupp SVP Ivo Siebers.

AEC Tech | Jan 25, 2018

Four high-tech solutions to mitigate theft on the jobsite

Geo-fencing and drone surveillance are among the tech solutions for protecting jobsites from asset loss.

BD+C University Course | Jan 2, 2018

The art and science of rendering: Visualization that sells architecture [AIA course]

3D artist Ramy Hanna offers guidelines and tricks-of-the-trade to ensure that project artwork is a stunning depiction of the unbuilt space.

Reconstruction & Renovation | Dec 21, 2017

Interactive map includes detailed information on historic New York City buildings

The New York City Landmarks Preservation Commission launched a new, enhanced version of its interactive map, Discover NYC Landmarks.

AEC Tech | Dec 20, 2017

6 CFD post-processing tips to improve visualization productivity and quality

Southland Engineering’s Abdullah Karimi offers helpful tips for making computational fluid dynamics (CFD) models more productive.

Sponsored | Building Team | Nov 3, 2017

4 strategies for marketing your AEC firm

Having a clearly defined competitive brand and a fine-tuned marketing approach can give your firm a significant competitive advantage.

Sponsored | AEC Tech | Oct 19, 2017

3 reasons why your firm needs cloud software

For firms looking to propel their architectural design services to new heights and levels of sophistication, a consolidated cloud-based platform is a valuable asset.

AEC Tech | Oct 6, 2017

How professional bias can sabotage industry transformation

Professional bias can take the form of change-resistant thinking that can keep transformational or innovative ambitions at bay. Tech consultant Nate Miller presents three kinds of bias that often emerge when a professional is confronted with new technology.

AEC Tech | Aug 25, 2017

Software cornucopia: Jacksonville Jaguars’ new practice facility showcases the power of computational design

The project team employed Revit, Rhino, Grasshopper, Kangaroo, and a host of other software applications to design and build this uber-complex sports and entertainment facility. 

boombox1
boombox2
native1

More In Category


3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021